Sec. 16.04.080. - General construction requirements.

TO BE LAID IN STRAIGHT AND DIRECT LINE. In laying sewer pipes, the drain layer shall lay them in as straight and direct a line as possible from the opening in the main or city sewer to the end of the building drain. Offsets in a building sewer shall be permitted only to avoid permanent structures, trees or other immovable objects, which does not include dirt piles, sand piles or other movable construction materials. Plumbing drains shall be stubbed out of the building on the side of the building closest to the city main sewer. CHANGES IN DIRECTION. All changes in direction shall be made with a wye or a one-eighth bend or by other methods approved by the superintendent of central inspection. If the connection with the wye in the city sewer is to be made with a bend, such bend shall be a one-eighth bend only. The building sewer shall commence two feet outside the foundation and any aggregate change of direction in excess of one hundred and thirty-five degrees shall require a cleanout be installed and extended to finish grade. This clean out is in addition to the required cleanout for each one hundred feet or portion thereof. UNIFORM GRADE REQUIRED. All building sewers shall be laid with a one-fourth inch per foot grade from the end of the building drain to a point allowing no greater than a forty-five degree vertical drop to the main or city sewer. No horizontal line shall be laid with less than one-quarter inch fall per foot, except that with prior approval a building sewer may be laid with a fall of not less than one-eighth inch per foot; provided when laid on one-eighth inch per foot it shall be laid with surveying instruments. SEWER PIPES. Sewer pipes shall be of the following types in accordance with specifications given and shall be free from defects and cracks; bowed or curved lengths shall be termed defective and not used. No part of any building sewer or drain shall be less than one foot below the surface of the ground, except replacement of existing building sewers. (a) Vitrified glazed clay pipe conforming to the requirements of ASTM Designation, C200-64T and the latest revisions thereof with factory installed resilient couplings conforming to ASTM Designation C 425-64 and the latest revisions thereof. Lubricant sealer is to be used as recommended by the manufacturer. (b) Service weight or extra heavy cast-iron bell and spigot soil pipe and fittings coated inside and out meeting Commercial Standard CS-188. Joints shall be firmly packed with picked oakum or hemp and secured with molten lead with at least twelve ounces of fine soft caulking lead being used for each inch of the pipe diameter for each joint, or the joints when properly applied to suitable cast-iron bell and spigot pipe and fittings shall be made with an approved neoprene gasket, which is compressed as the spigot is inserted into the bell of the pipe. (c) ABS (acrylonitrile-butadiene-styrene) Schedule 40 conforming to ASTM D-2661 (current edition) and carrying the appropriate National Sanitation Foundation Seal of Approval for such pipe and fittings may be used. (d) PVC (polyvinyl chloride) Schedule 40 conforming to ASTM D-2665 (current edition) and carrying appropriate National Sanitation Foundation Seal of Approval for such pipe and fittings may be used. (e) Effective ninety days after the passage of the ordinance codified in this section, ABS (acrylonitrile-butadiene-styrene) Schedule 40 plastic with a cellular core (ASTM-F628), PVC (polyvinyl chloride) Schedule 40 plastic with cellular core (ASTM F891) and PVC (polyvinyl chloride) SDR 35 (ASTM D-3034) will be prohibited for use as a material for building sewers. DITCHES TO BE BOTTOMED TO UNIFORM GRADE. All ditches must be bottomed to a uniform grade before sewer pipe is laid. Bell holes shall be carefully hand-dug so that no part of the load is supported by the bells. The full load should rest on the barrel of the pipe. Bell holes shall be no larger than necessary. Trench widths shall be kept as narrow as is practically possible from the bottom to the level of the top of the pipe. Except in rock or water bearing earth, the mechanical excavation shall stop above the final invert grade. If over digging occurs, the loosened earth must be removed and replaced with granular material. In water bearing soils where dewatering with well points is not effective or in rock, the trench shall be excavated a minimum of four inches below the pipe barrel and the pipe bedded in crushed rock. BUILDING SEWERS RUNNING PARALLEL TO BUILDING FOUNDATION OR BASEMENT WALL. No building sewer running parallel to a building foundation or basement wall shall be laid closer than two feet from the building foundation or basement wall, unless otherwise authorized by the superintendent of central inspection. PIPES TO BE BACKFILLED AND BEDDED. All pipes shall be bedded and tamped with dirt or sand along the sides to a height equal to one half the diameter of the pipe being used. Bedding material shall not contain rocks, bricks, clods or frozen earth. No bridging or propping up the pipe on bricks, blocks, or clods of dirt. After inspection of the installation proper backfilling techniques shall be completed. LAYING SEWERS ON MADE GROUND. No sewer shall be laid on filled or made ground in the bottom of the ditch, unless the backfilling shall be sand, properly and solidly tamped under, around, and over the top of the sewer. EXCAVATIONS TO BE PROPERLY BACKFILLED. The master drain layer to whom a sewer permit has been issued shall, for the sewer excavation covered by the permit, and in accordance with the provisions of this Code and other ordinances of the city regulating excavations in streets, alleys and other public grounds, properly backfill all excavations on city property, remove all surplus material and debris and maintain all trenches or ditches in a safe condition until the backfilled material has reached final settlement. (For provisions as to excavations in streets, alleys and other public places, see Chapter 10.20 of this Code.) REPLACEMENT OF PIPES, TRAPS, ETC., BROKEN IN MAKING REPAIR. Any sewer pipe broken in a building sewer or drain in making a repair of such building sewer or drain, or any pipe found to be broken when excavating for cleanout or repair, must be replaced with pipe of the same size as the original. Traps or other special fittings broken or found broken or defective shall be replaced with traps or other construction as provided in this chapter. All joints in repair or replacement work shall be the same as in new construction. When repairing a break, installing new lines or replacing the building sewer, a four-inch easily accessible cleanout shall be installed outside the building at grade within three feet of the outside wall or foundation; provided, however, that building sewers serving gravity drains which extend below a basement floor where such floor is four feet or more below grade at a point where the building drain extends outside the building are not required to install such a cleanout if there is an easily accessible four-inch cleanout in the basement for the building drain which is connected to the sewer. The outside cleanout shall consist of a twin cleanout. WORK TO BE INSPECTED AND APPROVED PRIOR TO BEING COVERED; FAILURE TO COMPLY. No person shall cover, or cause to be covered, any building sewer or drain or other connection with any city or private sewer or any portion thereof which has been installed or repaired without inspection and approval of the same by the sewer inspector. EXCEPTION: Up to twenty feet of any building sewer (measured at finish grade) may be covered for equipment turn-around as long as both the house connection and the main connection are left open for proper inspection including type of material, minimum grade and proper connections. If turn-around cannot be made in the twenty feet then the entire sewer shall be left open for inspection. If this provision is violated, the superintendent of central inspection shall require the necessary excavation to be made for the examination at the expense of the master drain layer whose license shall be suspended by the superintendent of central inspection until such excavation has been made. The master drain layer shall be subject to prosecution for violation of this title. The master or journeyman drain layer in charge of the ditch or an authorized employee of the master drain layer must be present when the work is inspected. He must have a good level and line, have all permits, and must give such necessary information as may be required of him.

(Ord. No. 43-344 § 4)