For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.93.210 — Permit requirements

The Code of the City of Wichita, Kansas (Supp. No. 36, Update 1: codified through Ordinance No. 53-088, adopted July 28, 2026) · Wichita City Code § 3.93.210

Corpus is an independent public-information project, not the official City of Wichita website. Stable reference: corpuslaw.us/code/242d2261-9bad-4b53-bb69-185e82889d3a

Sec. 3.93.210. - Permit requirements.

This chapter and individual franchises establish the general rules and scope of authority for a franchisee to construct and maintain its communications system within the right-of-way. The franchisee is still required to obtain individual permitting approval from the city engineer prior to engaging in actual construction of its specific facilities within the right-of-way. At least fifteen days before the beginning of any installation, removal or relocation of its facilities, a franchisee shall submit detailed plans of the proposed action to the city engineer. The city engineer shall, within fifteen days of receipt of such plans, either approve the plans or inform the franchisee of the reasons for disapproval. The franchisee shall designate a responsible contact person with whom representatives of the city engineer can communicate with on all matters relating to facilities installation and maintenance. A. Prior to any excavation within the right-of-way, a franchisee shall obtain a permit, pay all applicable fees, and perform such work in accordance with applicable provisions of the city ROW management code, and any ordinances or regulations that may be adopted by the city regarding excavation work. B. Every franchisee shall post a bond with the city in accordance with the city's ordinances in an amount determined by the city engineer, to guarantee the timeliness and quality of any construction, repair and restoration work, including damage to public or private property, and to guarantee the removal of its facilities from the city's right-of-way should such removal be required upon the expiration of its franchise. Such bond amount shall not exceed the estimated costs of the specific construction activity, and within six months of satisfactory completion of the construction project the bond amount shall be reduced to an amount of no more than one tenth of the initial face amount of the bond. The city attorney in the reasonable exercise of its discretion may waive the bond requirements upon a sufficient demonstration of self-insurance. C. Prior to the commencement of any construction or alteration of its facilities located in the right-of-way, a franchisee shall, if requested by the city engineer, furnish to the city engineer a subsurface utility engineering study based on available records maintained by existing utility companies, on the proposed route of construction, expansion or alteration, which must be approved by the city engineer. The study must consist of the following tasks: 1. All available plans, plats and other location data indicating the existence and approximate location of all facilities along the proposed construction route; 2. Completion of a visual survey and written record of the location and dimensions of any aboveground features of any underground facilities along the proposed construction route, including but not limited to manholes, valve boxes, utility boxes, post and visible street cut repairs; 3. Plot and incorporate the data obtained from completion of tasks 1 and 2 as set forth in this subsection, onto the franchisee's proposed system route maps, plan sheets and computer aided drafting and design (CADD) files; and 4. Provide all such data collected into a CADD file (or other format as may be identified by the city engineer) compatible with that used by the city engineer and deliver a copy to the city engineer.

(Ord. No. 44-845 § 3.17)

Ask a question about Wichita law

Corpus searches the Wichita sections it holds and shows the ones that match, with their citations. Free, no sign-in.