§ 16A-8 — Spill prevention and control plan (SPC plan)
Code of Ordinances, Lexington-Fayette Urban County Government, Kentucky (Republication: codified through Ordinance No. 048-2025, adopted June 26, 2025 (online July 17, 2026)) · Lexington-Fayette Urban County Code of Ordinances § 16A-8
Corpus is an independent public-information project, not the official City of Lexington-Fayette urban county website. Stable reference: corpuslaw.us/code/a92c86a2-8c50-4dde-b7cf-c61e9c5f97dd
Sec. 16A-8 - Spill prevention and control plan (SPC plan).
A spill prevention and control plan ("SPC") shall be prepared by the owner/operator or other person in possession or control of any facility where the amount of hazardous materials handled are equal to or in excess of a reportable quantity as defined by the United States Environmental Protection Agency, and shall be kept on site at all times. All persons that have or that are required to prepare an SPC plan shall sign a certificate stating that they have read, understand and agree to implement the plan. Copies of the SPC plan shall be kept on the premises affected and shall be readily available to inspectors upon request any time during working hours and any time during emergency situations. The SPC plan shall be updated every three (3) years or when changes of operation occur at the facility or some other change occurs which may affect the adequacy of the existing SPC plan. If no changes of operation have occurred since the last SPC plan update, a written statement to that effect from the owner/operator of the facility shall be sufficient to update the SPC plan. The division of fire and emergency services, HMC, HMPL and division of water quality and other applicable local and state agencies shall have the authority to review a facility's hazardous materials management practices when such facility has a discharge and does not have an existing SPC or SPCC plan. General provisions for the SPC plan shall include: Information to identify firm and facility where materials are handled; Description of facility and site; Identification of hazardous materials storage, transfer and process areas, including a map; Techniques to prevent and control discharges; Measures to ensure against fire and explosion; Self-inspection and monitoring schedules; Contingency plan, including spill notification procedures and availability of spill control equipment; Employee training in handling and disposal of hazardous materials; Hazardous materials data sheets (HMDS) where appropriate. All SPC plans shall include an implementation schedule for prevention and containment measures which are to be undertaken. The schedule shall identify those measures which may be implemented immediately due to insubstantial cost factors. More costly measures shall be implemented as soon as practical, and all measures shall be completed and implemented within two (2) years from the date of the plan. (Ord. No. 23-2013, §§ 6, 9, 3-7-13)
Ask a question about Lexington-Fayette urban county law
Corpus searches the Lexington-Fayette urban county sections it holds and shows the ones that match, with their citations. Free, no sign-in.
