For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17C-29 — Town Branch Commons

Code of Ordinances, Lexington-Fayette Urban County Government, Kentucky (Republication: codified through Ordinance No. 048-2025, adopted June 26, 2025 (online July 17, 2026)) · Lexington-Fayette Urban County Code of Ordinances § 17C-29

Corpus is an independent public-information project, not the official City of Lexington-Fayette urban county website. Stable reference: corpuslaw.us/code/278a2a10-8691-42af-9774-3fd85b5d12e6

Sec. 17C-29 - Town Branch Commons.

Intent. The intent of this section is to support the following three (3) major policies as it applies to any installation, construction, maintenance or other work in the right-of-way, recognizing that Town Branch Commons is a distinct park and trail system, and as such has a unique identity and an established set of design standards that must be maintained. Incorporation by reference. The Town Branch Commons masterplan and design standards, as amended now or in the future, is incorporated herein by reference. All references to the Town Branch Commons masterplan and design standards are to have the same effect as if the documents were reproduced verbatim herein, and all such documents automatically include any and all subsequent amendments thereto as long as the parties that will be effected by such amendments have the ability to meaningfully participate in the process that is utilized to amend such document, or unless expressly indicated otherwise by a provision of this chapter. This provision shall not be interpreted to require that work performed prior to the adoption or amendment of such a document be subject to any newly created standard. Additional definitions. In addition to the definitions that apply for this chapter, the following definitions also apply to this section: Bicycle facility or bicycle path shall mean the path used exclusively for bicycles that runs from West Main Street (US 25) at Tucker Street via the southern side of West Vine Street, crossing to the north side of West and East Vine Street (US 25) at Broadway for the full length of Vine Street until it intersects with Main Street. The bicycle facility or bicycle path is located closer to the street than the pedestrian path. Bioswale shall mean landscape elements designed to concentrate or remove debris and pollution out of surface runoff water. Bioswales consist of a swaled drainage course with sloped sides and filled with vegetation. Bioswales are referenced in the Town Branch Commons masterplan and design standards as the Karst Streambed, Karst Cascade, and Karst Embankment. Multi-use path shall mean 1) the path used for both bicycles and pedestrians that runs from West Main Street (US 25) at Tucker Street to the slip lane at the northwest corner of Triangle Park, via the southern side of West Vine Street; and 2) the path used for both bicycles and pedestrians that begins at the northwest corner of Main Street and Vine Street and runs along the western side of Midland Avenue in its entirety, to the corner of Third Street. Pedestrian path shall mean the path used for the exclusive use of pedestrians that runs from West Main Street (US 25) at Tucker Street via the southern side of West Vine Street, crossing to the north side of West and East Vine Street (US 25) at Broadway for the full length of Vine Street until it intersects with Main Street. Limits on new underground facilities. New underground facilities placed directly under the pedestrian paths, bicycle paths, or multi-use paths, at least eighteen (18) inches below the subbase, wall foundation, or soil cell (whichever is deeper). Utility and construction work prohibited from the bioswale portions of the Town Branch Commons. These areas are referenced in the Town Branch Commons masterplan and design standards. If boring is required under plant beds, trees, bioswales, or similar feature, there shall be a minimum of eighteen (18) inch clearance below the underdrain or soil media (whichever is deeper) or as otherwise required by the director. Existing utilities located directly beneath a bioswale shall provide justification as to why it cannot be accessed elsewhere, as well as a construction and restoration plan. Any such plan must be created in conjunction with a licensed professional engineer and a registered landscape architect to ensure the functionality of the storm water system is retained per the Town Branch commons masterplan and design standards. Limits on aboveground facilities. New aboveground facilities prohibited from portions of Town Branch Commons that contain bioswales. However, overhead utility lines that pass at least thirty-five (35) feet overhead are acceptable. Existing facilities located directly on or above a bioswale shall provide justification as to why it cannot be accessed elsewhere, as well as a construction and restoration plan. Any such plan must be created in conjunction with a licensed professional engineer and a registered landscape architect to ensure the functionality of the storm water system is retained per the Town Branch Commons masterplan and design standards. Aesthetics. Any installation of new facilities, including poles and street lights, that are visible to the public must be an approved detail from, or meet the aesthetic standards of the Town Branch commons masterplan and design standards and Chapter 17C. New facilities may be integrated within existing street lights. However, the quantity of communication facilities allowed on a street light shall be limited to the quantity the street light was designed to hold. A clear vertical zone of 8.3 feet above ground must remain clear of all obstructions, including, but not limited to, overhead signs, banners, etc. on all pedestrian paths, bicycle paths, or multi-use paths, per the AASHTO Bike Guide. Nothing in this section shall limit the installation of new facilities on those sides of the affected streets not containing Town Branch Commons. Construction. All bicycle facilities and paths, pedestrian paths, and multi-use paths shall remain clear and passable during any construction, excavation, installation, operation, maintenance, or repair within Town Branch Commons. If a partial or complete closure is required, plans must be submitted and approved for rerouting pedestrian and bicycle traffic in a safe manner prior to construction. Any right-of-way or public property that is disturbed or damaged during the construction, excavation, installation, operation, maintenance, or repair of a facility shall be repaired within twenty-one (21) calendar days of the completion of those activities that caused the disturbance or damage. Restoration and maintenance. All projects occurring within the Town Branch Commons corridor must comply with the applicable restoration and maintenance standards found in the Town Branch Commons masterplan and design standards. In addition, any disturbance to any of the following areas of Town Branch Commons shall be returned to its previous and intended condition as outlined below: Multi-use paths, pedestrian paths, bicycle facilities, and intersections with specialty paving shall be restored in accordance with the Town Branch Commons masterplan and design standards. Landscaping: The landscaped areas of Town Branch Commons shall be restored in accordance with the Town Branch Commons masterplan and design standards. Any vegetation damaged during construction must be replaced with the same plant species. The removal or trimming of existing trees in the right-of-way shall comply with the government's street tree ordinance, tree protection ordinance, the provisions of article 6-10, or subdivision regulations concerning street trees, as applicable. All trees must be replaced by a minimum of four (4) inch caliper. Bioswales: Bioswales located within Town Branch Commons shall be restored in accordance with the Town Branch Commons masterplan and design standards. Any vegetation damaged during construction must be replaced with the same plant species. The removal or trimming of existing trees in the right-of-way shall comply with the government's street tree ordinance, tree protection ordinance, the provisions of article 6-10, or subdivision regulations concerning street trees, as applicable. All trees must be replaced by a minimum of four (4) inch caliper. Due to the performative nature of the bioswale system, a construction and restoration plan must be created and submitted for approval by the director. The plan must be created in conjunction with a licensed professional engineer and registered landscape architect to ensure the functionality of the bioswale system is retained per the Town Branch Commons masterplan and design standards. After restoration of the affected bioswale(s) is complete, a licensed professional engineer and registered landscape architect shall sign off on the condition of the bioswale(s) to ensure the restoration was performed properly on this sensitive feature. Guarantees. Each party performing work required by this subsection guarantees its work conforms to the requirements of the Town Branch Commons masterplan and design standards and shall maintain it for two (2) years following its completion. During this period it shall, upon notification from the director, correct all restoration work to the extent necessary, using the method required by the director. (Ord. No. 18-2019, § 8, 3-21-19)

Ask a question about Lexington-Fayette urban county law

Corpus searches the Lexington-Fayette urban county sections it holds and shows the ones that match, with their citations. Free, no sign-in.