Sec. 24-47. - Responsibility of contractor.
(a) Familiarity With Article; Instructions, Explanations From City Engineer: The contractor, or other person in charge of the work in the scope of this article, shall familiarize himself with the provisions of this article covering such work and may, upon request, receive explanations and instructions pertaining to the provisions of this article from the city engineer. (b) Reporting Discovery of City Monument or Surveyor's Mark Required: Whenever, during the excavation for any construction under the provisions of this article, the contractor or party doing such work discovers a city monument or surveyor's mark, he shall notify the city engineer and use all precaution to protect such monument or surveyor's marker. (c) Commencement of Work Within Specified Time; Work To Be Continuous Until Completed, Exception: The contractor shall begin work in all cases within sixty (60) days after the permit for such work is issued and shall prosecute the work continuously until the work is completed, unless unavoidably delayed by weather conditions or other cause not within the control of the contractor. (d) Maintenance of Lines and Grades; Errors Charged Against Contractor; Correction at Contractor's Expense: It shall be the duty of the contractor to maintain the lines and grades established and set by the city engineer throughout any construction subject to the provisions and specifications of this article; and any errors in lines or grades caused by stakes having been raised, lowered or otherwise changed or lost shall be charged against the contractor, and he will be required to correct such mistakes at his own cost and expense. (e) Protection of Finished Work Until Hardened and Set: The contractor shall employ adequate measures to protect all finished work from the elements of the weather until such construction has thoroughly hardened and set. (f) Maintenance of Safeguards: At all times and during the period any of the work under this article is being performed and until such work is completed and accepted and approved by the city engineer, the contractor shall place and maintain all necessary and proper barriers and other safeguards, including watchmen, if necessary, upon and around the work for the prevention of accidents; and at night he shall place, maintain and keep suitable and sufficient lights and flares to warn the public of the obstructions and hazards. (g) Removal of Debris, Waste, etc.: After all work is completed, the contractor shall remove all rubbish, waste and excess materials and shall have the land used for construction purposes and the street and right-of-way area in a neat and clean condition.
(Code 1955, § 20-60)
Ask a question about Owensboro law
Corpus searches the Owensboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.