For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-71 — Permits required; fees

Municipal Code of the City of Owensboro, Kentucky (Codified through Ordinance No. 13-2026, adopted June 16, 2026. (Supp. No. 54, Update 2)) · Owensboro Municipal Code § 5-71

Corpus is an independent public-information project, not the official City of Owensboro website. Stable reference: corpuslaw.us/code/6f4eecb6-3ee5-4fbb-ae8a-6828e7288344

Sec. 5-71. - Permits required; fees.

(a) The Owensboro Metropolitan Planning Commission is designated the local enforcement agency for codes referenced in the article. (b) The Owensboro Metropolitan Planning Commission shall fix the rate to be charged for electrical permit fees subject to approval of the board of commissioners. All electrical permit fees shall be collected and accounted for by the Owensboro Metropolitan Planning Commission in the manner and form required by law; and all disbursement for accounts financed by electrical permit fees shall be ordered paid out only upon approval of the Owensboro Metropolitan Planning Commission. (c) It shall be unlawful for any person to install, alter or repair any electrical work covered by this article without first obtaining a permit from the electrical inspector. If the cost of an electric installation is less than two hundred dollars ($200.00), a permit shall be required but no fee shall be charged. The life of a permit may be extended, if necessary, upon application, but all permits shall be void within sixty (60) days if the work is not begun within that time. If work for which a permit is required commences prior to obtaining a permit, the fee hereinafter provided shall be double; but payment of such double fee shall not relieve any person from full compliance with the requirements of this article in the execution of the work performed or any other penalties prescribed. Permits shall be issued only to a contractor who has a valid electrical contractor's license issued by the State of Kentucky except those issued to the city, or to homeowners, or to holders of a limited license, issued by the State of Kentucky, that also hold a business license, issued by the city, for their respective occupations. Special one-time permits may be issued to others for the installation of specialized systems. (d) Electrical construction permit fees are hereby established as follows: (1) Residential (single-family): $75.00 minimum or $0.05 per square foot whichever is greater. (2) Residential (multifamily): $75.00 first unit, plus $10.00 for each additional unit. (3) Commercial: 1.5 percent of electrical contract with a $75.00 minimum. (4) Industrial: 1.5 percent of electrical contract with a $75.00 minimum. (5) All electrical service change out: $35.00 (6) All mobile home service pole installations: $35.00 (7) Temporary service poles: $20.00 (8) Additional trips: $15.00 (e) For the purpose of electrical permit fees each unit shall be considered as single-family.

(Code 1955, § 7-19; Ord. No. 9-85, 5-7-85; Ord. No. 36-86, § 1, 5-28-86; Ord. No. 12-95, § 3, 3-21-95; Ord. No. 30-98, § 2, 7-7-98; Ord. No. 39-2004, § 1, 12-7-2004)

Ask a question about Owensboro law

Corpus searches the Owensboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.