For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

2:366 — Discharge permits

Code of Ordinances, City of Baton Rouge and Parish of East Baton Rouge (Supp. No. 104, Update 1: codified through Ordinance No. 19941, passed September 23, 2026) · Baton Rouge Code of Ordinances § 2:366

Corpus is an independent public-information project, not the official City of Baton Rouge and Parish of East Baton Rouge website. Stable reference: corpuslaw.us/code/587e31b6-3df1-4e2e-8509-a9a0f7574e94

Sec. 2:366. - Discharge permits.

(a) Any discharger shall be required to apply to and secure from the director a permit allowing discharge into a MS4 or provide the director with a copy of the La. DEQ and NPDES permits. (1) Existing dischargers not previously required to obtain a permit who presently discharge into a MS4 shall secure from the director a discharge permit application which shall be completed, filed and all applicable fees paid within ninety (90) days of the receipt of notice from the director of the applicability to such user of the permit system requirements. Upon approval of application, the director shall issue a discharge permit containing specific conditions which shall be consistent with the provisions of this chapter. Any La. DEQ or NPDES permit shall serve as a city-parish permit. (2) Any new source or new discharger is prohibited from making any connection to a MS4 until the user has applied for and received from the director a discharge permit. Upon approval of the application, the director shall issue a discharge permit containing specific conditions which shall be consistent with the provisions of this chapter. A La. DEQ and/or NPDES permit shall serve as a city-parish permit. (b) Application for permits and specific permit conditions shall be in a form as determined by the director. Permit conditions shall include provisions to meet the following objectives: (1) To prevent the introduction of pollutants into a MS4 which interfere with the operation of a MS4 including interference with its use of disposal of sediments; (2) To prevent the introduction of pollutants into a POTW which will pass through the MS4 or otherwise be incompatible with such structures; and (3) To improve opportunities to recycle and reclaim sludges and sediments. (c) No discharger shall increase or otherwise change its permitted discharge without first notifying the director in writing, requesting and receiving a permit modification to cover said change. (d) All MS4 permits issued by the director shall be for a period of not longer than one year from date of issuance. The director may modify any permit when discharge conditions change or regulatory discharge limitations as set forth in this chapter are increased or decreased. Upon the occurrence of a change in discharge conditions, or a modification of limitations, but at least in conjunction with the renewal of a permit, the director shall review and adjust the permit fee accordingly (if applicable). (e) The director shall develop a MS4 permit fee schedule and determine a formula for the calculation of appropriate fees for dischargers permits based upon the MS4 permit fee schedule. The permit fee schedule and formula shall be subject to final approval by the metropolitan council. Such a fee system shall be initiated by the director when required. (f) No MS4 permit may be transferred from the permitted user to another person without prior written notification to the director of the proposed transfer. The transferor shall provide the transferee with a copy of the MS4 materials provided to transferor by the director, including a copy of the MS4 permit and all applicable regulations. (g) Significant user. The following provisions shall apply to all users which are permitted by DEQ and/or have a NPDES permit. Significant users must comply with the requirements applicable to any permit plus must meet the requirements, standards and criteria set forth herein. (1) Inspection. The director shall inspect each significant user at least once a year. (2) Evaluations. The director shall evaluate, at least every two (2) years, whether each significant user needs a plan to control varied discharges. If the director determines that a stormwater runoff plan is needed, the plan shall be prepared by the significant user and submitted to the director for review and approval. Such plan shall contain, at a minimum, the following elements: a. Description of runoff discharge practices; b. Description of all chemicals and hazardous substances stored at the facility site; c. Procedures for immediately notifying the MS4 of accidental discharges, including any discharge that would violate a prohibition of this chapter, with procedures for follow-up written notification to the director within five (5) days of any reportable event; d. If necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response. (3) Listed significant users. The director shall obtain from La. DEQ a list of all users meeting the criteria in paragraph (2) of the definition of significant user. The list shall identify the criteria in paragraph (2) of the definition of significant user applicable to each discharger and for users meeting the criteria shall also indicate whether the director has made a determination that such user should not be considered a significant user. (4) Reporting requirements. In addition to the requirements set forth in section 2:367 hereof, the director shall require appropriate reporting from those significant users with discharges that are subject to DEQ and NPDES permit requirements. Each significant user shall submit to the director, (on dates specified by the director) a description of the nature, concentration, and flow of the pollutants required to be reported by the director. These reports shall be based on sampling and analysis performed in the period covered by the report, and performed in accordance with the techniques described in 40 CFR Part 136 and amendments thereto. Copies of DEQ and NPDES permit compliance reports shall be acceptable. Where 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the USEPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using validated analytical methods or other applicable sampling and analytical procedures approved by the director and the USEPA. Sampling and analysis may be performed by the director in lieu of a significant or non-significant discharger upon the request of the user or upon refusal of the user to comply with the requirements hereof. When the director collects all the information required for the report, the user will not be responsible for all submission of the report but shall be responsible for all costs associated with sampling and analysis, and if testing by the director is required because of refusal of the significant user to test, such refusal shall be considered to be a significant violation of this chapter.

(Ord. No. 10966, § 1, 9-10-97)

Ask a question about Baton Rouge and Parish of East Baton Rouge law

Corpus searches the Baton Rouge and Parish of East Baton Rouge sections it holds and shows the ones that match, with their citations. Free, no sign-in.