2:382 — Permitted use
Code of Ordinances, City of Baton Rouge and Parish of East Baton Rouge (Supp. No. 104, Update 1: codified through Ordinance No. 19941, passed September 23, 2026) · Baton Rouge Code of Ordinances § 2:382
Corpus is an independent public-information project, not the official City of Baton Rouge and Parish of East Baton Rouge website. Stable reference: corpuslaw.us/code/595c6bf9-8039-494a-89ca-59841ee8354a
Sec. 2:382. - Permitted use.
(a) Permitted use. Placement of a wireless communications facility and any related pole or support structure in the city-parish rights-of-way shall be a permitted use under the applicable land use ordinances of the city-parish, but subject to compliance with the requirements of this chapter. (b) Permit required. No person shall place a wireless communications facility or support structure in the city-parish rights-of-way or without first filing a WCF permit application and obtaining a WCF permit, except as otherwise provided in this chapter. All required permits for the construction, installation and operation of wireless communications facilities within the ROW shall be applied for under the same unified WCF permit application. (1) Except as set forth in subsection (b), no modification may be made to an existing wireless communications facility or associated pole/support structure without obtaining a new WCF permit. (2) No WCF permit shall confer any exclusive right, privilege, license, or franchise to occupy or use any public property. (c) Pole attachment agreements required. Nothing herein shall confer any right to install wireless communications facilities upon public or privately-owned poles or support structures, absent a separate attachment agreement with the owners of such poles and support structures. (d) No permit required. Except as set forth in subsection (b), no WCF permit is required to: (1) Perform maintenance on, replace or repair a wireless communications facility or associated pole/support structure, provided such maintenance, replacement or repair does not: a. Materially change the loading; b. Increase the RF emissions levels beyond the maximum levels allowed by applicable law; c. Constitute a substantial change; or d. Otherwise exceed the conditions of the WCF permit. (2) A wireless provider or franchised cable operator may install micro wireless facilities by suspending such facilities from authorized communications cables attached to utility poles, without the need to obtain a permit, provided that the wireless provider or cable operator provides advance notice to the city-parish, that such installations comply with all applicable standards. (e) Administrative approval. Unless otherwise specified, a permit issued under this article shall be in the form of an administrative approval, and shall not require a conditional use permit, variance, or other authorization requiring a public hearing or approval of the city-parish council, the city-parish planning and zoning commission, or any other public commission, board or entity.
(Ord. No. 17997, § 1, 12-9-20)
Ask a question about Baton Rouge and Parish of East Baton Rouge law
Corpus searches the Baton Rouge and Parish of East Baton Rouge sections it holds and shows the ones that match, with their citations. Free, no sign-in.
