For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 114-181 — Baseline monitoring reports

Code of Ordinances of the City of Bossier City, Louisiana (Codified through Ordinance No. 182-2025, adopted December 2, 2025 (Supp. No. 23)) · Bossier City Code of Ordinances § 114-181

Corpus is an independent public-information project, not the official City of Bossier City website. Stable reference: corpuslaw.us/code/95fcef33-66a2-4650-ab93-a6f408eb1b58

Sec. 114-181. - Baseline monitoring reports.

Upon promulgation as a categorical industrial user, the user shall be required to submit to the director of public utilities the following: (1) Baseline monitoring report (BMR). Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a categorical determination under 40 CFR 403.6(a)(4), whichever is later, existing significant industrial users subject to such categorical pretreatment standards, and currently discharging to or scheduled to discharge to the POTW, shall be required to submit to the city, a report which contains the information listed in paragraph (2) below. At least 90 days prior to commencement of their discharge, new sources, and sources that become industrial users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the city a report which contains the information listed in paragraph (2) below. A new source shall also be required to report the method of pretreatment it intends to use to meet applicable pretreatment standards. A new source shall also give estimates of its anticipated flow and quantity of pollutants discharged. (2) The industrial user shall submit the information required by this section including: a. Identifying information. The name and address of the facility including the name of the operator and owners. b. Wastewater discharge permits. A list of any environmental control wastewater discharge permits held by or for the facility. c. Description of operations. A brief description of the nature, average rate of production, and standard industrial classification of the operation(s) carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. d. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams, as necessary, to allow use of the combine waste stream formula set out in 40 CFR 403.6(e). e. Measurement of pollutants. 1. Identify the categorical pretreatment standards applicable to each regulated process. 2. Submit the results of sampling and analysis identifying the nature and concentration (and/or mass, where required by the standard or by the city) of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum and long-term average concentrations (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 114-164(c). 3. Sampling must be performed in accordance with procedures set out in section 114-164(b). f. Certification. A statement reviewed by the industrial user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. g. Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards; the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in section 114-182. h. All baseline monitoring reports must be signed and certified in accordance with section 114-146.

(Ord. No. 21-2022, § 9, 2-15-2022)

Ask a question about Bossier City law

Corpus searches the Bossier City sections it holds and shows the ones that match, with their citations. Free, no sign-in.