Sec. 98-64. - Backfilling, resurfacing, repaving responsibility; requirements.

All backfilling or repaving of any such excavations shall be done either by the department of public works or by the permit holder or other person under the direction of the director of public works, in accordance with the following specifications: (1) Backfilling. a. All excavations shall be made with vertical walls. b. Backfill shall be made with good sound material, free from wood, trash or other foreign materials. c. Backfill shall be made in not more than six inch layers of moist materials, and shall be firmly and solidly packed and tamped until the excavation is completely filled with well packed material. (2) Resurfacing. a. In all unpaved streets and alleys, after backfill is completed, the surface shall be reconstructed or replaced with whatever type of material existed on such street or alley when the excavation was made, and the surface and connections with adjacent surface material shall be finished in a manner satisfactory to the commissioner of streets and parks. b. In all unpaved sidewalks, banquette, boulevard or planting space areas, after backfill is completed, such areas shall be replaced in the condition that existed prior to making the excavations, particularly regarding sod or grass, and proper elevation of finished surface, and in planting areas no trench or excavation shall be made that will remove or endanger any shrubbery, flowers, trees or other planting, unless special arrangements are made with the director of public works. (3) Repaving. a. After backfill is completed to subgrade or to the bottom of paving slab or foundation in all paved streets or alleys, the paving material shall be removed beyond all outside vertical lines or walls of the excavation, and beyond any wall line that should develop due to the caving or sliding of any wall, a distance of 12 inches on all minor traffic streets and alleys and a distance of 24 inches on all major thoroughfares, so as to leave a shoulder of solid and unbroken earth on all sides of the excavation as an additional foundation for new concrete. b. New concrete of standard grade and mix shall be poured into the excavation; where the street is of solid concrete, the excavation shall be filled to the surface of the street and the concrete shall be finished with a smooth and even surface; where the street has a concrete foundation with a surface of asphalt or other material, the concrete shall be poured to the top of the paving slab and the surface shall be finished with the same material as the surface of the street, in a manner satisfactory to the director of public works. c. Where the excavation is made through a concrete sidewalk, the excavation shall be backfilled as above outlined, a cut back shall be made 12 inches on each side of the vertical lines or walls of the excavation and the sidewalk shall be replaced in the same manner as the concreting of streets, provided in subsection (3)b of this section.

(Code 1980, § 25-44)