§ 99-7 — Conditions for issuance of permit
Code of Ordinances of the City of Bossier City, Louisiana (Codified through Ordinance No. 182-2025, adopted December 2, 2025 (Supp. No. 23)) · Bossier City Code of Ordinances § 99-7
Corpus is an independent public-information project, not the official City of Bossier City website. Stable reference: corpuslaw.us/code/bbfa892e-c595-4a8a-9333-ebf97efaf8ea
Sec. 99-7. - Conditions for issuance of permit.
No permit shall be issued, except upon the following conditions: (1) Traffic on the street shall not be unduly interfered with during the period of construction; (2) Upon completion of such construction, the street or highway shall be promptly restored to its former condition of usefulness, at the expense of the applicant for the permit, and the restoration shall be subject to the supervision and approval of the city engineer of the city; (3) When laying the utility lines or pipelines, all requirements of the department of transportation and development for the laying of similar lines across state highways, including requirements for depth, height, character and quality of the conduit or pipeline and manner of construction, shall apply; provided, however, that a utility line running parallel to a street or highway shall be laid in or on the outer edge of the ditch line of the street or highway farthest removed from the edge of the street surface and, provided, further, that all underground utility lines shall be laid to a minimum depth of 24 inches below the surface and provided, further, that all underground pipelines (exclusive of utility lines) shall be laid to a minimum depth of 48 inches lower than the lowest part of the drainage or bar ditch; (4) The applicant shall compensate the city for all damages resulting to any city street and/or infrastructure owned, operated and maintained by the City of Bossier City in the laying, maintaining, erecting or installation of any utility line which is not corrected or restored by the applicant; (5) The applicant shall protect, hold harmless, and indemnify the city and its agents and employees against any claims, damages or losses for personal injury or property damage sustained by third parties by reason of the exercise of the permit; (6) The applicant shall agree to remove and dispose of the utility lines or pipelines larger than four inches in diameter, including abandoned casings, as soon as they stop serving a useful purpose. Where it is not possible nor feasible to remove pipelines and/or casings under existing public rights-of-way, such pipelines and/or casings may be abandoned in place provided removals shall be accomplished by the owner, as near to the street or highway on each side as possible and in all cases, beyond existing ditches to right-of-way lines, and further provided that all pipelines and/or casings abandoned under the street or highway shall be abandoned in accordance with the Louisiana Department of Public Transportation ("DOTD") Title 49 (i.e., pipelines must be purged, capped, and filled with grout); (7) When laying pipelines, the applicant must agree to comply with all of the standards for the installation of pipelines on state highways required by the DOTD, including its engineering and directives standard manual in effect at the time of said laying of the pipelines; and (8) When laying pipelines, the applicant must agree to relocate or lower any pipeline at no cost to the city, should same become necessary due to any reason, including widening or lowering or any other alteration to the roadway or right-of-way; (9) Prior to commencement of laying pipelines, the applicant shall furnish the city engineer with a plat showing the location of such pipelines or flowlines, including GIS information sufficient to locate the pipelines or flowlines in the future, including the beginning and end points of the pipeline or flowline and sufficient points in between the pipeline or flowline route and the depth of cover information; and detailed cross-section drawings for all public rights-of-ways and easement crossings as allowed by the city. Failure to provide necessary GIS information shall act as a release of the city from responsibility for any damages or cost of repair to such pipelines or flowlines arising from any activity by or under authority of the city.
(Ord. No. 41-2009, 6-2-2009; Ord. No. 51-2021, Att., 6-1-2021)
Ask a question about Bossier City law
Corpus searches the Bossier City sections it holds and shows the ones that match, with their citations. Free, no sign-in.