§ 21-220 — General requirements
Code of Ordinances of the City of Lake Charles, Louisiana (Codified through Ordinance No. 20598, enacted August 5, 2026. (Supp. No. 21, Update 1)) · Lake Charles Code of Ordinances § 21-220
Corpus is an independent public-information project, not the official City of Lake Charles website. Stable reference: corpuslaw.us/code/f38f42a0-e38f-4d5a-ab36-859c8a8ec3cf
Sec. 21-220. - General requirements.
The operator shall certify all state requirements have been met by signing a certification statement as part of the grading application and/or building/development permit application. Refer to current specific LPDES permit for site applicability, notice of intent (NOI), and notice of termination (NOT) requirements. (1) All operators of construction sites shall use best management practices to control and reduce the discharge, to the city's storm drainage system and to waters of the United States, of sediment, silt, earth, soil, and other material associated with the clearing, grading, excavation, and other construction activities to the maximum extent practicable. Such best management practices may include, but not be limited to, the following measures: a. Ensuring that existing vegetation is preserved where feasible and that disturbed portions of the site are stabilized as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased. Stabilization measures may include: temporary seeding, permanent seeding, mulching, geotextiles, sod stabilization, vegetative buffer strips, protection of trees, preservation of mature vegetation, and other appropriate measures; b. Use of structural practices to divert flows from exposed soils, store flows, or otherwise limit runoff and the discharge of pollutants from the site to the extent feasible; c. Minimization of the tracking of sediments off-site by vehicles, the generation of dust, and the escape of other windblown waste from the site; d. Prevention of the discharge of building materials, including cement, lime, concrete, and mortar, to the city's storm drainage system or waters of the United States; e. Providing general good housekeeping measures to prevent and contain spills of paints, solvents, fuels, septic waste, and other hazardous chemicals and pollutants associated with construction, and to assure proper cleaning and disposal of any such spills, in compliance with state, federal, and local requirements; f. Implementation of proper waste disposal and waste management techniques, including covering waste materials and minimizing ground contact with hazardous chemicals and trash; g. Timely maintenance of vegetation, erosion and sediment control measures and other best management practices in good and effective operating condition; and h. Installation of permanent structural measures during the construction process to control pollutants in stormwater discharges that will occur after construction operations have been completed (post-construction). These structural measures should be placed on upland soils to the degree attainable. Such installed structural measures may include, but not be limited to, the following: stormwater detention structures (including wet ponds); flow attenuation by use of open vegetative swales and natural depressions; other velocity dissipation devices, infiltration of runoff on site; and sequential systems which combine several practices. Operators of construction sites are only responsible for the installation and maintenance of permanent stormwater management measures prior to final stabilization of the site, and are not responsible for maintenance after stormwater discharges associated with construction activity have terminated. (2) Personnel (provided by the operator of the construction site) shall inspect disturbed areas of any construction site (meeting criteria of current LPDES permit) that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or exit the site in accordance with the current LPDES permit. All erosion and sediment control measures and other identified best management practices shall be observed in order to ensure that they are operating correctly and are effective in preventing significant impacts to receiving waters and the city's storm drainage system. Based on the results of the inspections, best management practices shall be revised as appropriate, and as soon as is practicable. (3) The city may require any plans and specifications that are prepared for the construction of site improvements to illustrate and describe the best management practices required by subsection (1) above that will be implemented at the construction site. The city may deny approval of any building permit, site development plan, or any other approval necessary to commence or continue construction, or to assume occupancy, on the grounds that the management practices described in the plans or observed upon the site inspection by the city are determined not to adequately control and reduce the discharge of sediment, silt, earth, soil, and other materials associated with clearing, grading, excavation, and other construction activities to the maximum extent practicable. (4) Any owner of a site of construction activity, whether or not he/she is an operator, is jointly and severally responsible for compliance with the requirements in this section. (5) Any contractor or subcontractor on a site of construction activity, who is not an owner or operator, but who is responsible under his/her contract or subcontract for implementing a best management practices control measure, is jointly and severally responsible for any willful or negligent failure on his/her part to adequately implement that control measure if such failure causes or contributes to causing the city to violate a water quality standard, the city's LPDES permit, or any other state-issued discharge permit for discharges from its city's storm drainage system. (6) Based on the results of the inspections required by subsection (2), the site description and/or the pollution prevention measures shall be revised as appropriate, but in no case later than one calendar day following the inspection. Such modifications shall provide for timely implementation of any changes to the SWPPP within seven calendar days (per the state stormwater general permit for small construction activities) following the inspection. (7) Upon final stabilization of the construction site, the owner or the duly authorized representative thereof shall submit written certification to the city that the site has been finally stabilized. The city may withhold an occupancy or use permit for any premises constructed on the site until certification of final stabilization has been filed and the city has determined, following any appropriate inspection, that final stabilization has, in fact, occurred and that any required permanent structural controls have been completed.
(Ord. No. 14348, § 1, 11-21-07)
Ask a question about Lake Charles law
Corpus searches the Lake Charles sections it holds and shows the ones that match, with their citations. Free, no sign-in.
