§ 6-402 — Amendments to the adopted technical manual
Code of Ordinances of the City of Lake Charles, Louisiana (Codified through Ordinance No. 20598, enacted August 5, 2026. (Supp. No. 21, Update 1)) · Lake Charles Code of Ordinances § 6-402
Corpus is an independent public-information project, not the official City of Lake Charles website. Stable reference: corpuslaw.us/code/756ff387-474e-4c06-ac2d-c5b8cf511597
Sec. 6-402. - Amendments to the adopted technical manual.
The Standard Gas Code as adopted is hereby amended and changed in the following respects, as approved by and endorsed by the plumbing board of adjustment and appeals. (1) Section 104.2.3 of the Standard Gas Code is hereby amended to read as follows: 104.2.3. Design professional. All drawings, specifications, and accompanying data should bear the name and address of the designer. The designer shall be an architect or engineer legally registered under the laws of this state regulating the practice of architecture or engineering and shall affix his official seal to said drawings, specifications, and accompanying data to the following: 1. In the case of new buildings or structures of Group E—Educational, Group I—Institutional and Group A—Assembly Occupancy. 2. New buildings or structures three stories or more in height. 3. New buildings or structures 5,000 square feet or more in area. Exception: One- and two-family dwellings, and all Group R3 buildings, regardless of size, shall not require a registered architect or engineer. (2) The following subsection of Section 108—Board of Adjustment and Appeals are hereby amended to read as follows; all other subsections are to remain the same: 108.1. Appointment. There is hereby established a board of adjustment and appeals which shall be the Plumbing Board of Adjustment and Appeals. All duties and functions of this board shall be the same as provided under the plumbing section of this code. 108.2.1. Membership. The board shall consist of five members and one alternate. Said board shall be composed of one Louisiana licensed architect, one Louisiana licensed engineer, one Louisiana licensed journeyman plumber, one master licensed plumbing contractor, and one member at large from the public, and one alternate. A board member shall not act in a case in which he has a personal or financial interest. 108.2.2. Terms. Of the members first appointed, two shall be appointed for a term of one year, two shall be appointed for a term of two years, and one shall be appointed for a term of three years. Thereafter, the members shall be appointed for terms of four years. The alternate shall be appointed for a term of one year. Vacancies shall be filled for an unexpired term in the manner in which original appointments are required to be made. Continued absence of any member from regular meetings of the board shall, at the discretion of the mayor, render any such member liable to immediate removal from office. 108.2.3. Quorum and voting. A simple majority of the board shall constitute a quorum. In varying any provision of this code, the affirmative votes of the majority present, but not less than three affirmative votes shall be required. In modifying a decision of the building official, not less than three affirmative votes, but not less than a majority of the board, shall be required. In the event that regular members are unable to attend a meeting, the alternate members, if appointed, shall vote. 108.2.4. Secretary of the board. The building official or his designee shall act as secretary of the board and shall make a detailed record of all of its proceedings, which shall set forth the reason for its decision, the vote of each member, the absence of a member, and any failure of a member to vote. 108.3. Powers. The Plumbing Board of Adjustment and Appeals shall have the power as further defined in Section 108.4 to hear appeals of decisions and interpretations of the building official or his designee and consider variances of the technical codes. (1) To act as an advisory board in matters pertaining to plumbing, drainage and gas fitting, including all devices, appliances, fixtures and equipment. (2) To examine and license all master gas fitters. (3) To adopt such reasonable rules and regulations as may be necessary for the administration and enforcement of this code, provided such rules and regulations are consistent with the provisions set forth, and in accordance with recognized standards and practices in the plumbing, drainage, and gas fitting industry. It shall be the duty of the plumbing board to review complaints against any licensed and registered plumbing contractor, journeyman plumber, and master gas fitter, registered under provisions of this ordinance, who has violated or has allegedly violated any part of this code. After a full and open hearing where witnesses may be present, evidence taken and an opportunity given to be heard, the plumbing board may, by a majority vote of members present, rescind the license or certificate of registration, suspend the license or certificate for such time as it deems fair and just, or refer charges to the State Plumbing Board Grievance Committee for their review and recommendation at the discretion of the plumbing board in accordance with the evidence presented and under provisions of this or other ordinances. Any decision or ruling rendered by the plumbing board may be appealed to the board of review. 108.4.1. Decisions of the building official or his designee. The owner of a building, structure, or service system, or his duly authorized agent, may appeal a decision of the building official or his designee to the Plumbing Board of Adjustment and Appeals whenever anyone of the following conditions are claimed to exist: 1. The building official or his designee rejected or refused to approve the mode or manner of construction proposed to be followed or materials to be used in the installation or alteration of a building, structure, or service system. 2. The provisions of this code do not apply to this specific case. 3. That an equally good or more desirable form of installation can be employed in any specific case. 4. The true intent and meaning of this code or any of the regulations therein have been misconstrued or incorrectly interpreted. (3) Section 306.1 of the Standard Gas Code is hereby amended to read as follows: 306.1. Metallic pipe. Metallic gas piping shall be steel pipe complying with ANSI B36.10, ASTM A53 or ASTM A106. Steel pipe may be galvanized. (4) Section 306.2 of the Standard Gas Code is hereby amended to read as follows: 306.2. Metallic tubing. Steel tubing shall comply with ASTM A539 or ASTM A254. (5) Appendix B of the Standard Gas Code is hereby amended to read as follows: Appendix B: Permit fee schedule. (A) Each applicant applying for a permit under this article shall pay a permit fee in accordance with the following schedule: Minimum permit-gas work requiring inspection .....$10.00 One gas opening or gas test .....10.00 Each additional opening .....2.00 First gas meter loop .....10.00 Additional gas meter loop, each .....2.00 Reinspection fee .....10.00 (B) Reinspection fees and additional fees: If any reinspection is made necessary by faulty, incorrect or defectively installed work on any building or structure, or if any inspection of a successive step of construction is not requested as required by the plumbing code prior to commencement of further construction or occupancy, a fee computed on the basis of $10.00 per hour for time spent due to inspection or inspection, subject to a minimum of $25.00. This fee shall be in addition to any other fees or charges required by this chapter. Failure to promptly pay this or any other fee required herein shall be grounds for issuance of a stop work order, in addition to other remedies as provided by law. (C) Double fee: Where work for which a plumbing permit is required by this code is started prior to obtaining said permit, the fees herein specified shall be doubled. The payment of such double fee shall not relieve any person from fully complying with the requirements of the code, the execution of the work nor from any other penalties prescribed herein. (D) Technology/computer fees: Each applicant applying for a permit under this article shall pay a $5.00 technology/computer fee in addition to any permit fees.
(Ord. No. 10662, § 2, 2-21-96; Ord. No. 15660, § 1, 11-3-10)
Ask a question about Lake Charles law
Corpus searches the Lake Charles sections it holds and shows the ones that match, with their citations. Free, no sign-in.
