For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.5 — RIGHT-OF-WAY DESIGN

Code of Ordinances, City of Shreveport, Louisiana (Supp. No. 85, Update1: codified through Ordinance No.150, 2025 adopted December 9, 2025) · Shreveport Unified Development Code § 13.5

Corpus is an independent public-information project, not the official City of Shreveport website. Stable reference: corpuslaw.us/code/889edb45-f1e0-4094-83b8-c16a68d76da2

13.5 - RIGHT-OF-WAY DESIGN

All rights-of-way must meet the right-of-way standards of Article 12. A. In the case of public roads, the plat must indicate that the City of Shreveport, as applicable, will take responsibility for maintaining the public road after final acceptance. In the case of a private road, the plat must state that the City will not accept any private road in the future. Within the City of Shreveport, curb and gutter are required as part of right-of-way design. B. The subdivider must furnish and erect all necessary traffic control and directional signs, including street signs, as designated by the City Traffic Engineer. All signs must be of a type approved by the City Traffic Engineer. C. Shoulders are required along all streets not provided with curbs and gutters. Green infrastructure design is encouraged for shoulders. Curbs and shoulders must be designed to meet the American Association of State Highway and Transportation Officials (AASHTO) standards. D. All street construction within the City of Shreveport must meet the standards of Chapter 78, Streets, Sidewalks and Other Public Places, of the Shreveport Code of Ordinances. E. The following must be complied with during construction: 1. During construction of streets with curb and gutter, the subdivider is prohibited from partially installing pavement below the gutter elevation during construction operations. The subdivider is required to maintain positive drainage throughout construction and install pavement up to the finished gutter elevation on a temporary basis. A temporary cross slope of less than 2% is allowed during construction operations to match the gutter elevation. At the conclusion of construction, the subdivider must remove the appropriate thickness of the pavement surface in order to establish the final approved cross section of the roadway. 2. The subdivider is responsible for maintaining and repairing all roads in the subdivision until the roads are accepted by the City of Shreveport. 3. Subdivision roads will not be accepted by the City of Shreveport until all construction detailed in the plans is completed. It is the responsibility of the subdivider to consult with the of Engineering and Environmental Services before the work has begun to afford the Department of Engineering and Environmental Services an opportunity to inspect the work as construction progresses.

(Ord. No. 95, 2021, § 14, 7-13-21)

Ask a question about Shreveport law

Corpus searches the Shreveport sections it holds and shows the ones that match, with their citations. Free, no sign-in.