For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 34-121 — Definitions

Code of Ordinances, City of Shreveport, Louisiana (Supp. No. 85, Update1: codified through Ordinance No.150, 2025 adopted December 9, 2025) · Shreveport City Code § 34-121

Corpus is an independent public-information project, not the official City of Shreveport website. Stable reference: corpuslaw.us/code/3fb8d93b-7053-40f7-9fb1-fbbc5fa58e20

Sec. 34-121. - Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Design storm means a storm which deposits a stated amount of precipitation within a stated period of time over a defined area and which is used in calculating storm runoff and in designing drainage control, flood control and erosion control measures. Detention means a temporary storage of a determined quantity of water with a release rate that is either fixed or variable. Drainage plan means a detailed plan prepared in graphic format with or on a detailed grading plan addressing onsite and offsite drainage control, flood control and erosion control issues. Erosion means the process by which the ground surface is worn away by the action of wind and/or water. Erosion control means treatment measures for the prevention of damages due to soil movement and deposition. Existing means those conditions which are in place as of the date of enactment of this article. Grading plan means a detailed plan prepared in graphic format describing the existing topography and proposed grading including, but not limited to, retaining wall locations and size, excavation and filling details, and interfaces with adjacent properties, streets, and storm drainage systems, referenced to mean sea level and showing sufficient contours, spot elevations and cross sections to allow a clear understanding by reviewers, contractors and inspectors. Land altering activity means any change to existing land including, but not limited to, clearing, grading, excavating, filling or other construction activities, such as parking lots, residential and commercial buildings, retaining walls, storm drainage systems, and utility main installations, or repairs thereof, any of which would physically alter the existing conditions and/or vegetative cover on the land. Owner means any person, or the city, parish or state, requesting permission to engage in any land altering activity. Permittee means any person or entity which has received a permit authorizing a land-altering activity. Sediment means soil or other surface materials transported by wind or surface water as a product of erosion. Small home garden means any noncommercial garden that does not create any substantial erosion onto adjoining property. Storm drainage system means the surface and subsurface system for the removal of stormwater runoff whether of an intermittent or continuous nature. This consists of, but is not limited to, any lakes, ponds, swales, ditches, diversions, culverts, storm sewers, streets and detention facilities. Storm runoff means that part of the rainfall which is not absorbed, transpirated, evaporated or left in surface depressions, and which then flows controlled or uncontrolled into a storm drainage system.

(Code 1971, § 14½-22; Ord. No. 74, 2003, § 5, 6-24-03)

Ask a question about Shreveport law

Corpus searches the Shreveport sections it holds and shows the ones that match, with their citations. Free, no sign-in.