For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 78-212 — Excessive damage to roads by motor vehicles

Code of Ordinances, City of Shreveport, Louisiana (Supp. No. 85, Update1: codified through Ordinance No.150, 2025 adopted December 9, 2025) · Shreveport City Code § 78-212

Corpus is an independent public-information project, not the official City of Shreveport website. Stable reference: corpuslaw.us/code/a95df1ab-5d93-475d-a6ca-fd01b3effeff

Sec. 78-212. - Excessive damage to roads by motor vehicles.

(a) At any time excessive damage is caused to any city road by the use of motor vehicles or equipment belonging to or under the direction of any responsible party which is beyond the ordinary and normal usage of such roads, such parties shall at their own expense, repair or restore the portion of any road so damaged to a passable condition. It is the express intent of the city that the department of public works, or his/her designee, be a last provider of said repair and restoration work. (b) The stated policy in subsection (a) of this section shall be implemented and placed into effect as to all responsible parties who make extensive use of the city roads for the purpose of any type construction, development, or industrial projects, including but not limited to the drilling of oil or gas wells, large construction projects, removal of timber or any other type of natural resources in the following manner: (1) Impassable roads; emergency, temporary and priority repairs. In the event that a portion of a city road being used by a responsible party becomes impassable by virtue of such usage then: a. The responsible party shall immediately give express notice to the director of public works, or his/her designee, and said notice shall include as a minimum the following information: 1. Road name. 2. Permit number. 3. Nature and location of damages or defects. 4. Method and type of repairs. 5. Estimated date of completion. The proposed repair techniques and completion date will be acceptable unless modified by the director of public works, or his/her designee, via express mail within two working days of receiving the responsible party's notice. b. If the director of public works, or his/her designee, of public works determines that a portion of the road being used by a responsible party becomes impassable and an express notice has not been received from the responsible party using the road, director of public works, or his/her designee, of public works will send an express notice containing the information indicated in subsection (b)(1)a. of this section. If the responsible party consistently relies upon the director of public works, or his/her designee, to identify impassable roads and notify all parties instead of proactively doing such work itself, then the director of public works, or his/her designee, may impose fees to cover the cost of such work. c. The responsible party shall commence repairs within five calendar days of issuing or receiving express notice described in subsections (b)(1)a. and b. of this section. Said repairs shall be performed in a good, diligent, workmanlike manner until completed. d. In the event the director of public works, or his/her designee declares the road repairs to be an emergency the responsible party shall commence repairs within 24 hours of said declaration and subsequent notice to the responsible party. Said repair work shall then be completed in a good, workmanlike, diligent manner consistent with the declared emergency. e. Upon completing the repairs, the responsible party shall immediately give express notice that the work has been completed in accordance with the previous express notices and that an inspection of the work is requested. The director of public works, or his/her designee, shall then have two working days to accept or reject the work. If an express notice rejecting the work is not sent from the director of public works, or his/her designee, within the allowable time, then the repair work will be considered accepted. f. In the event the responsible party fails to commence repairs in accordance with subsections (b)(1)c. and d. of this section the following shall apply: 1. The director of public works, or his/her designee, shall give express notice to the responsible party advising the following: (i) The repairs identified in the first letter of notice have not commenced. (ii) If the repairs have not commenced within five days of this second notice, (24 hours if an emergency) then the responsible party is in violation of this section. (iii) That if the responsible party does not commence the road repairs as required within five days of this second notice (24 hours if an emergency), the responsible party will be denied future road use permits unless a bond or other acceptable security is provided in accordance with this section for those who are determined violators of this section. (iv) That if the responsible party does not commence the road repairs within five calendar days of this second notice (24 hours in an emergency) the city may make the needed repairs and shall seek reimbursement for all costs of the repairs including overhead. The invoice for said costs shall be paid within 30 days of receipt by the responsible party. (v) That if the responsible party does not commence making the road repairs as required within five calendar days of this second notice (24 hours if an emergency), the responsible party will be fined the sum of $500.00 for each violation. (vi) The responsible party has a right to a hearing before the city council by requesting same through the clerk of council within five calendar days of this second notice to dispute being held in violation of this section. 2. If after the second notice, the responsible party again fails to commence the required repairs to the impassable road, then a violation of this section is deemed to have occurred and the director of public works, or his/her designee, of public works may commence the repairs. The responsible party has a right to an appeal before the city council to dispute a violation of this section by requesting same through the clerk of council within 14 calendar days of the second notice. (2) Permanent restoration of road. a. Upon completing the project, the responsible party shall give express notice to the director of public works, or his/her designee, that the project is complete and an inspection of the road used by the responsible party is requested. b. Within ten working days of receiving the express notice, the responsible party and the director of public works, or his/her designee, shall meet to determine what damage, if any, was caused by the responsible party's use of said road and what restoration work is necessitated by such use to restore the road as much as practicable to its condition at the time the permit was issued. c. Subsequent to the meeting described in subsection (b)(2)b. of this section, the responsible party and the director of public works, or his/her designee, shall follow the procedures established in subsection (b)(1)a. of this section for the road restoration work. d. If the responsible party fails to immediately initiate the express notice required in subsection (b)(1)a. of this section, then the director of public works, or his/her designee, will issue express notice to the responsible party containing the information described in subsection (b)(1)a. of this section. e. The responsible party shall commence the restoration work within 14 calendar days, or 24 hours if an emergency as described in subsection (b)(1)a. of this section, from issuing or receiving express notice as described in (b)(2)c. and d. of this section. Said work shall be performed in a good, diligent workmanlike manner until completed. f. Acceptance of the completed work shall follow the procedure described in subsection (b)(2)e. of this section. g. A 180-day warranty on the restoration work will commence upon acceptance of said work by the director of public works, or his/her designee, as described in subsection (b)(2)f. of this section. If no restoration work is performed, then the warranty shall be for the repair work performed in subsection (b)(1) of this section. h. Thirty days prior to the expiration of the 180-day warranty, the responsible party shall give express notice to the director of public works, or his/her designee, that the restoration work is in good condition and a final inspection is requested. The director of public works, or his/her designee, will then have ten working days to send express notice of rejection to the responsible party or said work will be deemed acceptable. i. Any work rejected by the director of public works, or his/her designee, shall be repaired or restored in accordance with subsection (b)(1) of this section. j. Upon acceptance of said work by the director of public works, or his/her designee, the responsible party will be released from additional road repair/restoration work associated with the use of roads while constructing the project. k. In the event the responsible party fails to commence repairs/restoration within the time allowed in subsection (b)(2)e. of this section, then the procedures described in subsection (b)(1)f.1. and 2. of this section shall be followed. (3) Contractors; violation; security; shared responsibility. a. The repair or restoration work described in subsection (b)(1) or (2) of this section may be provided by the responsible party's own employees, contractors or other entity/individuals acceptable to the director of public works, or his/her designee. b. Any responsible party receiving a final finding that they are in violation of any provision of this section shall be guilty of a misdemeanor. c. The security shall be in an amount equal to 50 percent of the permitted mile road value to guarantee the payment of any damages to any road or bridge sustained as a consequence of the transportation authorized by the permit. The per mile road values will be evaluated on an annual basis by the director of public works, or his/her designee, and adjustments thereto recommended to the city. d. Whenever two or more responsible parties share all or part of a road described in their respective permits, all parties shall contribute/share in the cost of any repair and restoration work on a pro rata basis. The determination of respective liability between parties shall be determined by the director of public works, or his/her designee. e. Should any provision of this section be declared invalid, such shall not invalidate or affect the remaining provision hereof. f. Safety devices shall be properly positioned in the road right-of-way by the responsible party immediately upon issuing or receiving a first notice of impassable road conditions and while performing work in said right-of-way. Said safety devices shall be properly maintained in accordance with LA-DOTD standards until all work is completed and accepted by the director of public works, or his/her designee.

(Ord. No. 66, 2024, 6-11-24)

Ask a question about Shreveport law

Corpus searches the Shreveport sections it holds and shows the ones that match, with their citations. Free, no sign-in.