§ 94-42 — Extensions generally
Code of Ordinances, City of Shreveport, Louisiana (Supp. No. 85, Update1: codified through Ordinance No.150, 2025 adopted December 9, 2025) · Shreveport City Code § 94-42
Corpus is an independent public-information project, not the official City of Shreveport website. Stable reference: corpuslaw.us/code/d01881f8-91fd-42bf-b603-e7288d1b7772
Sec. 94-42. - Extensions generally.
(a) Approach and boundary mains. This subsection applies to approach and boundary mains only. The city may extend any main within the system at its cost if it is determined by the director that the extension will relieve potential health concerns or the extension will be of benefit to the city. The director may recommend that departmental funds be utilized for a portion of or for all of the extension. (1) Whenever a developer or applicant desires a water or sewer main extension to serve a proposed or existing development, the developer or applicant shall make application to the department of engineering and environmental services for such extension. The developer or applicant shall install the main and pay the full cost of the extension. (2) The extension must be approved by the department of engineering and environmental services and water and sewerage. The department of engineering and environmental services shall determine the proper size of the proposed main needed to serve the development. (b) Other mains. The developer shall pay all costs for the installation of water and sewer mains within his development except as set forth in subsection (c) of this section. This subsection does not apply to approach and boundary mains. (c) Oversize mains. Should the city determine that it is in the best interests of the city that water and sewer mains be installed which have a greater capacity than that required for service to the applicant's property or service to or within a developer's development, the city may participate in the additional costs of such mains if funds are available. (d) Extension outside city limits. Should an applicant or developer desire water or sewer service outside the city limits, the applicant or developer shall comply with sections 94-7 and 94-8 prior to approval of an extension or service connection. All requests for extensions outside the city limits shall require city council approval of the applicant's or developer's request for connection to the water or sewer system before construction of the main extension may begin. (e) Refusal of line extensions. If the director determines that the extension of water or sewer service into an area not designated as a growth incentive zone shall not be in the best interest of the city, permission may be refused for such extension, even though the applicant or developer offers to pay the full cost of such extension. A line extension shall be refused if the extension will allow development in an area that will: (1) Endanger the quality of water supply sources; (2) Overload water, sewerage or drainage systems or streets; or (3) Cause loss of property or life. The applicant or developer may appeal the determination by the director to refuse an extension, as provided in this article.
(Code 1971, § 37-34; Ord No. 112, 1992, § 37-26, 8-11-92; Ord. No. 36, 1994, 3-22-94; Ord. No. 15, 2013, 8-27-13; Ord. No. 109, 2014, 11-11-14)
Ask a question about Shreveport law
Corpus searches the Shreveport sections it holds and shows the ones that match, with their citations. Free, no sign-in.