§ 23-45 — Facility sewer connection specifications
Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 23-45
Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/9ca153a6-f7fa-4da5-b064-b24c071ef4da
Sec. 23-45. - Facility sewer connection specifications.
With respect to connection of a building sewer into a sewer interceptor owned by the facility: (1) The size, slope, alignment, materials or construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the commissioner and relevant municipality. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply. (2) No person shall make connection of roof downspout, exterior foundation drains, areaway drains, or other sources of surface runoff or ground water to a building sewer or building drain which in turn is connected directly or indirectly to a facility sewer interceptor. (3) The connection of the building sewer in the facility sewer interceptor shall conform to the requirements of the building and plumbing code or other applicable rules and regulations of the commissioner and relevant municipality, or the procedures set forth in appropriate specifications of the A.S.T.M. and the W.P.C.F. Manual of Practice No. 9. All such connections shall be made gastight and watertight. Any deviation from the prescribed procedures and materials must be approved by the commissioner and the municipality before installation. (4) The applicant for a sewer connection permit for a connection into a facility sewer interceptor shall notify the commissioner and the municipality when the building sewer is ready for inspection and connection to the facility sewer interceptor. The connection shall be made under the supervision of the commissioner or its designee. (5) All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways, and other property disturbed in the course of the work shall be restored in a manner satisfactory to the commissioner and the municipality. (6) All costs and expenses incident to the installation and connection of the building sewer to the facility's sewer interceptor shall be borne by the owner. The owner shall indemnify the city and the municipality from any loss or damage that may directly or indirectly be occasioned by the installation or connection of the building sewer.
(Ord. No. D395, 10-18-96)
Ask a question about Brockton law
Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
