For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-91 — Reporting requirements

Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 23-91

Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/5c08c9c4-0422-48e3-b3cf-97aa90b5ffec

Sec. 23-91. - Reporting requirements.

(a) Baseline report. Within one hundred eighty (180) days following the effective date of a national categorical pretreatment standard, an existing industrial user subject to said standard and currently discharging to or scheduled to discharge to the facility shall submit to the commissioner a report as prescribed in 40 C.F.R. section 403.12(b), which shall include the information required under section 23-85(1) through (8) of this article. The commissioner shall require documentation indicating compliance with a BMP when determined to be necessary. This report shall be signed and certified pursuant to 40 C.F.R. section 403.12(l) by an authorized representative of the industrial user, and shall contain a statement certified by a qualified professional engineer indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements. At least ninety (90) days prior to commencement of discharge, new sources, and sources that become industrial users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the commissioner a report which contains the information required in section 23-85(1) through (8) of this article. Reports by new sources shall include information on the method of pretreatment the new source intends to use to meet applicable pretreatment standards. The report shall be signed and certified pursuant to 40 C.F.R. section 403.12(l) by an authorized representative of the industrial user and shall contain the certification described above. (b) Compliance schedule progress reports. If the certification statement described in paragraph (a) above states that additional pretreatment and/or operation and maintenance (O&M) will be required to meet the pretreatment standards and requirements, the industrial user shall submit to the commissioner a compliance schedule as described in section 23-85(7) hereof. Not later than fourteen (14) days following each date in the compliance schedule and the final date for compliance, the industrial user shall submit a progress report to the commissioner as prescribed at 40 C.F.R. section 403.12(c) stating, at a minimum, whether or not the industrial user complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress: the reason for the delay; and the steps being taken by the industrial user to return the construction to the schedule established. In no event shall more than nine (9) months elapse between such progress reports to the commissioner. (c) Compliance deadline report. Within ninety (90) days following the date for final compliance with applicable categorical pretreatment standards or in the case of a new source, following commencement of the introduction of wastewater into the facility, any industrial user subject to pretreatment standards and requirements shall submit to the commissioner a report containing the information described in section 23-85(4) through (6) of this article. The report shall be signed and certified pursuant to 40 C.F.R. section 403.12(l) by an authorized representative of the industrial user. For industrial users subject to equivalent mass or concentration limits established by the facility in accordance with the procedures in 40 C.F.R. section 403.6(c), this report shall contain a reasonable measure of the industrial user's long term production rate. For all other industrial users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report will include the industrial user's actual production during the appropriate sampling period. (d) Periodic reports on continued compliance. (1) Any industrial user subject to a categorical pretreatment standard, after the compliance date of such pretreatment standard, or, in the case of a new source, after commencement of the discharge into the facility, shall submit to the commissioner during the months of June and December, unless required more frequently in the pretreatment standard or by the commissioner, EPA, or DEP, a report indicating the nature and concentration of pollutants in the effluent which are limited by such categorical pretreatment standards. In addition, this report shall include a record of measured or estimated average and maximum daily flows for the reporting period for the discharge reported in paragraph (4) of section 23-85 of this article, except that the commissioner may require more detailed reporting of flows. At the discretion of the commissioner and in consideration of such factors as local high or low flow rates, holidays, budget cycles, etc., the commissioner may agree to alter the months during which the above reports are to be submitted. This report shall be signed and certified pursuant to 40 C.F.R. section 403.12(l) by an authorized representative of the industrial user. (2) Where the city has imposed mass limitations on industrial users as provided for by 40 C.F.R. section 403.6(d), the report required by section 23-91(d)(1) of this article shall indicate the mass of pollutants regulated by pretreatment standards in the discharge from the industrial user. (3) Where the city has imposed Best Management Practices on industrial users, the report required by section 23-9 (d) (1) of this article shall indicate compliance with said BMP. (4) For industrial users subject to equivalent mass or concentration limits established by the city in accordance with the procedures in 40 C.F.R. section 403.6(c), the report required by section 23-91(d)(1) of this article shall contain a reasonable measure of the industrial user's long term production rate. For all other industrial users subject to categorical pretreatment standards expressed only in terms of allowable pollutant discharge per unit of production (or other measure of operation), the report required by section 23-91(d)(1) of this article shall include the industrial user's actual average production rate for the reporting period. (e) Reports by significant industrial users not subject to pretreatment standards. Any significant industrial user which is not subject to categorical pretreatment standards or requirements shall submit to the commissioner, during the months of June and December (unless required more frequently by the commissioner), a report as prescribed under 40 C.F.R. section 403.12(h) describing the nature, concentration and flow of those pollutants specified by the commissioner. (f) Notification of hazardous waste discharge. (1) An industrial user shall notify the commissioner, the municipality, the EPA Regional Waste Management Division Director, and the director of DEP's division of solid and hazardous waste, in writing, of any discharge into the facility of a substance which, if otherwise disposed of, would be a hazardous waste under 40 C.F.R. Part 261. Such notification shall include the name of the hazardous waste as set forth in 40 C.F.R. Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the industrial user discharges more than one hundred (100) kilograms of such waste per calendar month to the facility, the notification shall contain the following information to the extent such information is known and readily available to the industrial user; an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during the calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following twelve (12) months. All existing industrial users must file such notification no later than one hundred eighty (180) days after the discharge of the listed or characteristic waste. Any notification under this section 23-91(f) need be submitted only once for each hazardous waste discharged. However, all industrial users must notify the commissioner in advance, in accordance with section 23-87(b) of this article, of any change in their wastewater discharge. The notification requirement set forth herein does not apply to any pollutants already reported under the self-monitoring requirements set forth in sections 23-91(a), (b), (c), (d) and (e), above. (2) Industrial users are exempt from the requirements of section 23-91(f)(1), above, during a calendar month in which they discharge no more than fifteen (15) kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 C.F.R. sections 261.30(d) and 261.33(e). Discharge of more than fifteen (15) kilograms of non-acute hazardous wastes in a calendar month, or any quantity of acute hazardous waste as specified in 40 C.F.R. sections 261.30(d)and 261.33(e), requires a one-time notification. Subsequent months during which the industrial user discharges more than such quantities of any hazardous waste do not require additional notification. (3) In the case of any new regulations under Section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as hazardous waste, the industrial user must notify the commissioner, the municipality, the EPA Regional Waste Management Division Director, and the director of DEP's division of solid and hazardous waste, of the discharge of such substance within ninety (90) days of the effective date of such regulations. (4) In the case of any notification made under this section 23-91(f), an industrial user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. (g) Notification of changed discharge or potential problems. All users shall notify the commissioner immediately of all discharges that could cause problems to the facility, including any slug loadings by an industrial user. In addition, all industrial users shall promptly notify the commissioner in advance of any substantial change in the volume or character of pollutants in their discharge including the listed or characteristic hazardous wastes for which the industrial user has submitted initial notification under the provisions of section 23-91(f) hereof. (h) Reports by industrial users not subject to pretreatment standards. The commissioner shall require appropriate reporting from those industrial users with discharges that are not subject to pretreatment standards or requirements.

(Ord. No. D395, 10-18-96; Ord. No. K35, 11-25-19)

Ask a question about Brockton law

Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.