§ 27-158 — Administration
Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 27-158
Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/1ca899f4-c1cc-4000-96f2-c0fe18f91f29
Sec. 27-158. - Administration.
(1) Applicability. Proposals for residential development projects in the TSSGOD shall require site plan review by the approving authority/plan approval authority, as part of the site plan approval process. The approving authority may adopt administrative rules and regulations relative to the site plan approval process. Such rules and regulations and any subsequent amendments must be expressly approved in writing by DHCD and on file with the city clerk. (2) Pre-application review. The applicant is encouraged to participate in a pre-application review at the office of the city planner. The purpose of the pre-application review is to obtain the advice and direction of municipal departments typically involved in the regulatory permitting process prior to filing the application. At the pre-application review the applicant shall outline the proposal and seek preliminary feedback from the office of the city planner and other municipal review entities. (3) Application procedures. a. Filing. The applicant and his/her agent is to complete an application form available from the city and submit site plans in accordance with subsection (4) below. The city clerk shall stamp the time and date received on this application form, which is the official date of the application per M.G.L. Ch. 40R. b. Review fees. The applicant shall be required to pay for reasonable consulting fees to provide peer review of the application for the benefit of the approving authority. Such fees shall be held by the city in an interest-bearing escrow account, and shall be used only for expenses associated with the use of outside consultants employed by the approving authority in reviewing the site plan application. Such fees may be used only for reasonable, invoiced expenses associated with the review of the application by outside consultants including, but not limited to, attorneys, engineers, urban designers, housing consultants, planners and others. Any surplus funds remaining after the completion of such review, including any interest accrued, shall be returned to the applicant forthwith. c. Certification of complete application. Within thirty (30) days of the applicant filing of an application with the city clerk, the approving authority or its designee shall evaluate the proposal with regard to its completeness and shall submit an advisory report in writing to the applicant certifying the completeness of the application. The approving authority or its designee shall provide a letter to the applicant advising whether the application has been deemed complete. Where an application is deemed incomplete, the approving authority or its designee shall provide a list of the information that is missing. d. Review by other municipal agents. Upon receipt and filing with the city clerk, applications shall be distributed to other municipal boards and departments typically involved in the regulatory permitting process. Advisory reports from these municipal boards and departments shall be submitted to the approving authority within sixty (60) days of the filing of the application. Failure of any other municipal agent to provide a report within sixty (60) days of the filing of the application shall be interpreted as lack of opposition to any element of the proposal. The approving authority or its designee shall forward to the applicant copies of all recommendations received from other boards or departments within the prescribed sixty-day review period. e. Notice of public hearing. The approving authority shall hold a public hearing for the review of any site plan review application. Notice of the public hearing shall be given by publication in a newspaper of general circulation in the city once in each of two (2) successive weeks, the first publication to be not less than fourteen (14) days before the day of the hearing and by posting such notice in a conspicuous place in city hall for a period of not less than fourteen (14) days before the day of such hearing. Notice to parties in interest, as defined in this ordinance, shall be sent by mail, postage prepaid. The assessors maintaining any applicable tax list shall certify to the approving authority the names and addresses of parties in interest and such certification shall be conclusive for all purposes. The approving authority may accept a waiver of notice from, or an affidavit of actual notice to any party in interest or, in his stead, any successor owner of record who may not have received a notice by mail, and may order special notice to any such person, giving not less than five (5) nor more than ten (10) additional days to reply. (4) Application contents In order to be considered complete, all applications for TSSGOD site plan approval shall be comprised of the following: a. Completed TSSGOD application form. b. Complete list of abutters certified by the city assessor, including address labels. c. Development plan summary (narrative) including: (1) Proposed housing unit count and/or square footage of any accessory uses or structures; (2) Proposed number, location, configuration and design of proposed off-street parking spaces; (3) Information regarding the proposed number, type, location, deed restriction and marketing of proposed; and (4) Proposed off-site improvements (if any). d. Proposed site plan drawings at 1"=40' scale or greater stamped by a Massachusetts Registered Professional Engineer or other appropriate professional including one (1) original and fifteen (15) copies at 24" x 36" dimension; and two (2) paper copies at 11" x 17". The site plan drawings shall contain the following information: (1) Project name, boundaries, north arrow, date scale. (2) Assessor's parcel numbers of lot(s) subject to the application. (3) Names and address of applicant and project engineer. (4) Existing conditions on the lot(s). (5) Proposed names of new street(s), if any. (6) Proposed building footprints, parking areas, pedestrian ways. (7) Grading and stormwater management including location of stormwater management best management practices and construction details. (8) Data to determine location, direction, width and length of every street line, lot line, easement, zoning district and boundary line. (9) Indication of location and purpose for existing and proposed easements, if any. (10) Existing and proposed topography at two-foot contours. (11) Proposed landscaping plan (12) Proposed lighting plan. e. A statement detailing any proposed public improvements. f. Building elevation drawings at 1"=4' (including proposed construction materials and colors). g. Stormwater calculations demonstrating the adequate sizing of all selected BMPs. h. A stormwater management operation and maintenance plan. (1) The name(s) of the owner(s) for all components of the system. (2) A map showing the location of the systems and facilities including, but not limited to, catch basins, manholes/access lids, drain pipes, and stormwater devices. (3) Maintenance agreements that specify: a. The names and addresses of the person(s) responsible for operation and maintenance; b. The person(s) responsible for financing maintenance and emergency repairs; c. An inspection and maintenance schedule for all temporary erosion and sediment control practices and permanent stormwater management facilities, including routine and non-routine maintenance tasks to be performed; d. A list of easements with the purpose and location of each; and e. The signature(s) of the owner(s). (5) Site plan review decision. a. Unless the time period for a decision is extended by written agreement between the applicant and the approving authority, the approving authority shall make a decision on the site plan application filed under Section 27-148(3) above and file its decision with the city clerk within one hundred twenty (120) days of the date that the application was received by the city clerk. The time limit for public hearings and taking of action by the approving authority may be extended by written agreement between the applicant and the approving authority. A copy of such agreement shall be filed with the city clerk. b. Failure of the approving authority to take action within one hundred twenty (120) days or extended time, if applicable, shall be deemed to be an approval. c. An applicant who seeks approval because of the approving authority's failure to act on an application within the one hundred twenty (120) days or extended time, if applicable, must notify the city clerk in writing, within fourteen (14) days from the expiration of said time limit for a decision, of such approval and that a copy of that notice has been sent by the applicant to the parties in interest by mail and that each such notice specifies that appeals, if any, shall be made pursuant to M.G.L.A. c. 40R and shall be filed within twenty (20) days after the date the city clerk received such written notice from the applicant that the approving authority failed to act within the time prescribed. d. The approving authority's findings, including the basis of such findings, shall be stated in a written decision of approval, conditional approval or denial of the site plan approval application. The written decision shall contain the name and address of the applicant, identification of the land affected and its ownership, and reference by date and title to the plans that were the subject of the decision. The written decision shall certify that a copy of the decision has been filed with the city clerk and that all plans referred to in the decision are on file with the approving authority. e. The decision of the approving authority, together with the detailed reasons therefore, shall be filed with the city clerk. f. Effective date. If twenty (20) days have elapsed after the decision or the notice under paragraph (c), above, has been filed in the office of the city clerk without an appeal having been filed or if such appeal, having been filed, is dismissed or denied, the city clerk shall so certify on a copy of the decision. If the application is approved by reason of the failure of the approving authority to timely act, the city clerk shall make such certification on a copy of the application. A copy of the decision or application shall be recorded with the title of the land in question in the Plymouth County Registry of Deeds or the Plymouth Land Registry District, and indexed in the grantor index under the name of the owner of record or recorded and noted on the owner's certificate of title. The responsibility and the cost of said recording and transmittal shall be borne by the owner of the land in question or the applicant. (6) Criteria for approval. The approving authority shall approve the development project upon the following findings: a. The applicant has submitted the required fees and information as required by the city; and b. The proposed development project as described in the application meets all of the requirements and standards set forth in this article and applicable design standards, or a waiver has been granted therefrom; and c. Any extraordinary adverse potential impacts of the project on nearby properties have been adequately mitigated. (7) Criteria for conditional approval. The approving authority may impose conditions on a development project as necessary to ensure compliance with this article and the design standards set forth in Section 27-145, or to mitigate any extraordinary adverse impacts of the development project on nearby properties, insofar as such conditions are compliant with the provisions of M.G.L.A. c. 40R and associated Chapter 40R Regulations and do not unduly restrict opportunities for development. The approving authority may allow construction of an approved development project to be phased for the purpose of coordinating the development project with: a. Anticipated on-site or off-site infrastructure improvements; b. Securing of financial subsidies related affordable housing restrictions; c. The review of other related permit applications on the site including but not limited to applications for a subdivision, or applications before the conservation commission, Board of Health, or any state agency. (8) Criteria for denial. The approving authority may deny an application for site plan approval pursuant to this article only if it finds one (1) or more of the following: a. The development project does not meet the conditions and requirements set forth in this article and applicable design standards. b. The applicant failed to submit information and fees required by this article and necessary for an adequate and timely review of the design of the development project or potential development project impacts. c. It is not possible to adequately mitigate significant adverse development project impacts on nearby properties by means of suitable conditions. (9) Time limit. A site plan approval shall remain valid and shall run with the land indefinitely provided that construction has commenced within three (3) years after the decision issues, which time shall be extended by the time required to adjudicate any appeal from such approval. Said time shall also be extended if the project proponent is actively pursuing other required permits for the project or if there is good cause for the failure to commence construction, or as may be provided in an approval for a multiphase development project. (10) Appeals. Pursuant to M.G.L.A. c. 40R, § 11, any person aggrieved by a decision of the approving authority must appeal to the superior court, the land court, or the district court within twenty (20) days after the site plan decision or notice under subsection 5(c) above has been filed in the office of the city clerk.
(Ord. No. K13, 12-30-17)
Ask a question about Brockton law
Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
