§ 27-31 — C-4 Zones, planned shopping center zones
Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 27-31
Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/e69bab48-8fcb-4cea-8217-a1daa945a673
Sec. 27-31. - C-4 Zones, planned shopping center zones.
The C-4 planned shopping center zone shall be laid out, developed and used according to a plan prepared in compliance with the provisions of this section, in order to provide for modern retail shopping facilities in appropriate locations to serve residential neighborhoods. 1. Principal permitted uses. The use of each building or premises shall be in accordance with the plan referred to above, which use shall be limited to service, parking, retail sale of merchandise, offices and similar activities ordinarily accepted as shopping center uses. No building shall be designed, constructed, structurally altered or used for residential purposes, except to provide within the buildings allowed, facilities for a custodian, caretaker or watchman employed on the premises. 2. Procedure. The owner or owners of a tract of land comprised of two (2) acres or more may submit to the planning board a plan for the development and use of such tract for the purposes of, and meeting the requirements set forth in this section. Such plan shall comply with all requirements of this section and shall be accompanied by evidence concerning the feasibility of the project and the effect of the proposed development on surrounding property and other physical conditions. Such plan shall comply with the requirements set forth below: a. All of the standards set forth in the C-2 Zone must be complied with, except: 1. The minimum yard requirements shall be: (a) Front—25 feet (b) Side—30 feet (c) Rear—50 feet 2. Off-street parking shall be provided on the basis of one parking space for each ninety (90) square feet of ground floor space. 3. Off-street loading shall be provided on the basis of one loading or unloading berth for each fifteen thousand (15,000) square feet of ground floor space. b. A site plan defining the areas wherein buildings may be constructed, the areas which will be developed for parking and the proportionate amount thereof, the location of roads, driveways and walks and the points of ingress and egress, including access streets where required, the location and height of walls, the spaces for loading, the location and character of exterior lighting, and the character and extent of landscaping, planting and other treatment for protection of adjoining property. c. A drainage plan approved by the city engineer. d. A copy of any deed restrictions intended to be recorded. e. A report on the needs and extent of the market to be served, and general economic justification. f. A traffic analysis indicating the effect of the proposed shopping center on adjacent streets and also indicating the direction and amount of traffic flow to and from the shopping center. 3. Review and approval. The following action must be taken prior to the approval of a planned shopping center as permitted in the C-4 Zone: a. Before any action on any of the plans for a planned shopping center, the site plan and any supplemental information shall be submitted to the planning board for study and report. Reasonable additional requirements may be recommended by the planning board for the protection of adjoining residential property. Special consideration shall be given to the installation of underground utilities. The planning board regulations shall be adhered to when applicable. The planning board shall hold a public hearing and report its recommendations for approval or disapproval, together with the reasons therefor and additional requirements, if any, to the city council for action. After holding a public hearing on the planned shopping center in accordance with the statute or amending zoning ordinances, approval of such planned shopping center by the city council shall constitute a zoning change of the affected tract of land to a C-4 planned shopping center zone. If no report is transmitted by the planning board within twenty (20) days of its public hearing, the city council may take action without further awaiting such report. b. In the event that construction of the shopping center, as proposed, is not started within two (2) years from the date of approval by the city council, the district shall revert to the same zoning classification which existed prior to approval of the C-4 planned shopping center zone and the zoning regulations of such prior zone shall thereupon be in full force and effect. c. The plan may be amended in accordance with the procedure outlined in approval of such plan.
(Code 1965, § 27-31)
Ask a question about Brockton law
Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
