§ 10.16.040 — Procedure for obtaining a commercial parking permit
Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Code of Ordinances § 10.16.040
Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/b233c9fe-e9ac-4e9d-8183-4b92f02afd58
10.16.040 - Procedure for obtaining a commercial parking permit.
(a) An application for a New Commercial Parking Permit shall be submitted to the Director on a form available at the Cambridge Traffic, Parking and Transportation Department. Upon receipt of such application, the Director shall promptly transmit copies thereof to the CPCC. The CPCC shall hold hearings at least twice in each calendar year provided an application pending and permits may be issued consistently with Section 10.16.060. The CPCC shall establish a deadline for receipt of application prior to each hearing. All applications received by the dealing established by the CPCC shall receive consideration, provided that permits may be issued pursuant to Section 10.16.060. Applications not considered due to the restriction on the CPCC's ability to issue permits pursuant to Section 10.16.060 shall be considered in the order received at such time as the CPCC may issue permits. (b) The CPCC will publish in at least one local weekly newspaper a notice of the hearing. The notice shall set forth a specific hearing date not less than fourteen days from the date of publication, as well as the time and place of such hearing; said notice shall indicate that a copy of the application(s) is available for public inspection at the Traffic, Parking and Transportation Department. (c) Every application for a New Commercial Parking Permit shall include the following information: 1. Name and address of owner. 2. Address of proposed commercial parking space or parking facility. 3. Type of facility (e.g., parking lot or garage). 4. Type of construction proposed (new or modification) and estimated dates for start of construction and opening of facility (or availability of spaces). 5. Number of existing parking spaces and categories of use for each space at the facility, including non-commercial spaces. Use categories include: general public, customers, patients, clients, students, employees, residents, guests. 6. Number of proposed parking spaces and categories of use for each space. 7. Calculations of parking space requirements according to the appropriate section of the Cambridge Zoning Ordinance. 8. Detailed information on how use of the spaces will be controlled for each category of use. 9. For parking facilities with 20 or more total parking spaces, a plan, approved in writing by the City Manager's designee for regulation and control of air pollution from motor vehicles. Such plan shall describe traffic mitigation and parking and transportation demand management measure which will be implemented at the subject parking facility or elsewhere in Cambridge to minimize air pollution, single-occupant vehicle trips, and/or vehicle miles of travel to be generated by the proposed commercial parking space(s). 10. A detailed description of the need for the proposed commercial parking spaces and the type of development and patrons which the spaces and associated facility, if any, will serve. 11. A site plan and floor plans of the proposed parking facility, showing the facility location, any bicycle parking required by the Zoning Ordinance, the space layout, and the entry and exit points. 12. A detailed statement of any public policy considerations which support the application. Six copies of every application shall be submitted, with the above information, to the Commercial Parking Control Committee, c/o the Traffic, Parking and Transportation Department, City Hall Annex, 57 Inman Street, Cambridge, Massachusetts 02139. (d) The Committee shall be required to process any applications already on file with the Director at the time of the adoption of this Chapter in the order of the filing of said pending applications. All amendments to pending applications shall be deemed to relate back to the original date of filing. (e) At least 14 days before the hearing, the Commercial Parking Control Committee or its designee shall send to each applicant which has submitted a complete application an analysis of the application in regard to the criteria set out above. This analysis will highlight any further information required in order to make a full assessment of the application. Any applicant who has filed an incomplete application shall be so notified at that time. An application shall be deemed incomplete if it is not accompanied by all the information required by Section 10.16.040(c). (f) Within thirty (30) days after the hearing, the Commercial Parking Control Committee shall approve or disapprove the application after full consideration of all the facts contained in the application. In evaluating applications and making the determinations, the CPCC shall consider the following criteria: (1) Whether the applicant requests ten or fewer commercial parking spaces and whether the parking facility would have a combined total of twenty or fewer parking spaces if the application is granted; (2) Whether the application includes a written plan to make a good faith effort to hire qualified Cambridge residents as employees and a commitment to consult with the Cambridge Office of Work Force Development; and (3) Whether the project is consistent with the City's established planning and policy goals. The CPCC shall request evidence and doocumentation as it deems appropriate for substantiation of compliance with the above criteria. (g) The Director shall approve or disapprove the application in accordance with the Committee's determination. When the decision is made to approve an application, the decision shall (i) state the name, address and total number of authorized parking spaces at the facility; (ii) specify how many spaces are authorized for use as Commercial Parking Spaces; and (iii) describe any conditions upon which the application is approved. A copy of the Director's approval shall be sent to the applicant and the Commissioner, Massachusetts Department of Environmental Protection.
(Ord. No. 2024-7, 12-23-2024; Ord. 1192, Added, 09/08/1997)
Ask a question about Cambridge law
Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.
