12.12.110 - Proposed construction or excavation—Notification procedures.
Whenever the Superintendent of Streets is about to construct a new street, or to break up the surface of any street, he shall, at least two weeks before beginning work, notify the City Engineer, as head of the Sewer Division, City Electrician and all public utilities having locations in such street. If any of these departments or utility companies has any work to be done in the street so designated, it shall consult and arrange with the Superintendent, in order that such work may be done before the surface of such street is again prepared for and open to public travel. After such notice and opportunity have been given, none of the departments or utility companies shall, for the period of six months, break up such street within the area of such previous disturbance, except in case of obvious necessity, to be certified to and approved by the City Manager.
(Prior code § 17-19)