For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.40 — ENFORCEMENT

Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Zoning Ordinance § 12.40

Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/9d6c4dae-82c2-4e1a-95aa-debafd67888c

12.40 - ENFORCEMENT

12.41 Commencement of Construction. The developer shall begin construction of the PUD within twelve (12) months of the date of the granting of the Special Permit to construct a PUD. The Planning Board may grant in writing an extension of this time period of up to twelve (12) months upon determination of good cause by the developer. If the developer fails to commence construction of the PUD within the specified time, the Special Permit shall lapse. 12.41.1 If the PUD is to be developed in stages, then the developer must begin the construction of each stage within the time limits specified in the Final Development Plan. Construction in each phase shall include all the elements of that phase specified in the Final Development Plan. 12.42 The Planning Board, or its Designee, shall periodically monitor the construction of the PUD, with respect to start of construction and development phasing. If the Planning Board, or its designee, finds that either the developer has failed to begin development within the specified time period or that the developer is not preceding in accordance with the approved development phasing, with respect to either timing or construction of an approved mix of project elements, then the Planning Board shall review the PUD and may extend the time for start of construction or the length of time needed to complete a phase, revoke the Special Permit, or recommend that the developer amend the Final Development Plan subject to procedures specified in Section 12.37. If the Planning Board revokes the Special Permit for the PUD then the Final Development Plan shall be null and void.

Ask a question about Cambridge law

Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.