§ 13.16.040 — Interference and obstruction during construction
Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Code of Ordinances § 13.16.040
Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/b722d4f8-ffa7-427f-974f-0528619b8cbc
13.16.040 - Interference and obstruction during construction.
Whenever any street is opened for the laying of pipes for water, gas or other purposes, or for any work of construction, such laying of pipes and work connected therewith, or such work of construction shall be so executed as not to obstruct, in any way, the course, capacity or construction of any part of the City's Wastewater System and Stormwater Drainage system, and whenever pipes for any purpose, or any work of construction, are found to exist at such a depth or in such location as to interfere with any existing part of the city's Wastewater system or Stormwater Drainage System, the person maintaining the same, shall, upon notice thereof, at once remove, change or alter such pipe or pipes or other works, in such a manner as the City Engineer may direct.If such person neglects to comply immediately with the terms of such notification the City Engineer may make such removal, change or alternation, and the cost thereof shall be paid by such person; provided, that whenever any sewer is to be constructed, or any water pipe to be laid, in any street or way, the city Engineer and Chief Superintendent of Water works shall consult with each other in regard to the location of any existing pipes.
(Prior code 17—49) (Ord, 1313, Added, 01/28/2008)