For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.04.010 — Established—Work started prior to obtaining permit

Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Code of Ordinances § 15.04.010

Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/b7e0b267-eecc-4dea-bfae-885f30d89ffb

15.04.010 - Established—Work started prior to obtaining permit.

Effective June 1, 2009, where work for which a permit is required by this code is started or proceeded with, prior to obtaining such permit, the fee specified shall be tripled but payment of such triple fee shall not relieve any person from fully complying with the requirements of this code in the execution of the work nor from any other penalties prescribed in this code. Building Fees Description | Fee All new construction, repairs or alterations | $20.00 per $1,000.00 or fraction thereof of construction cost, $50.00 minimum fee. Exemption: $15.00 per $1,000.00 or fraction thereof of construction cost for three residential dwelling units or less, $50.00 minimum fee. Amendments to plans | $20.00 per $1,000.00 or fraction thereof of construction cost, $50.00 minimum fee. Exemption $15.00 per $1,000.00 or fraction thereof of construction cost for three residential dwelling units or less, $50.00 minimum fee. Demolition of buildings and structures | $20.00 per $1,000.00 or fraction thereof of construction cost, $50.00 minimum fee. Exemption $15.00 per $1,000.00 or fraction thereof of construction cost for three residential dwelling units or less, $50.00 minimum fee. Preliminary permits for foundations | $20.00 per $1,000.00 or fraction thereof of construction cost, $50.00 minimum fee. Exemption $15.00 per $1,000.00 or fraction thereof of construction cost for three residential dwelling units or less, $50.00 minimum fee. Certificate of occupancy: a. Place of assembly b. Residential c. Other d. Request for inspection of dwelling unit as per Section 119.3 of the StateBuilding Code. | Residential: $100.00 for first unit and $50.00 for each additional unit. Commercial: $100.00 plus $50.00 per 1,000 sq. ft.

(Ord. 1394, 6/12/2017; Ord. 1324, 5/18/2009; Ord. 1156, amended, 03/21/1994; Ord. 995 (part), 1983; Ord. 979 (part), 1982: prior code § 5-2)

Ask a question about Cambridge law

Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.