§ 15.08.030 — Electrical Permits Fee Schedule
Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Code of Ordinances § 15.08.030
Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/be6a910c-6927-42fc-98d8-728ea80a5fe4
15.08.030 - Electrical Permits Fee Schedule.
Effective June 1, 2009, electrical permit fees shall be as follows: Description | Fee 1. Minimum permit charge | $25.00 2. Switches, alarms, detectors, pullstations, etc. | 0.50 3. Lights per watts | 1.00 4. Receptacles: a. 15 ampere, each | 1.00 b. 20 ampere, each | 4.00 c. 30 ampere, each | 5.00 d. 50 ampere, each | 6.00 5. Motors: a. Less than 1 horsepower | 5.00 b. Each additional horsepower | 1.00 6. Signs | 40.00 7. Service per 100 ampere | 5.00 8. Meters, each | 5.00 9. Heat: a. Less than 1 KW | 5.00 b. Each additional KW | 1.00 c. Gas or oil burner | 35.00 10. Source of supply (Transformer, generator or rectifier): a. Less than 100 W | 3.00 b. Less than 10 KVA | 4.00 c. Each additional 10 KVA | 3.00 11. Quarterly permits | 100.00 12. Telephone wiring, per floor | 100.00 13. Alarm Systems | 75.00 14. Computer Systems | 75.00 15. Siding | 25.00
(Ord. 1325, 5/18/2009; Ord. No. 1168, Enacted, 10/02/95; Ord. 995 (part), 1983; Ord. 979 (part), 1982: prior code § 5-3)
Ask a question about Cambridge law
Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.
