For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.16.110 — Plans submitted to City Electrician upon request

Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Code of Ordinances § 15.16.110

Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/c2fe0683-2d32-4163-a56e-51e7ce697b70

15.16.110 - Plans submitted to City Electrician upon request.

Whenever the City Electrician shall request, any person operating electric or other wires, poles, ducts, conduits or manholes upon, over, through or under any public way or over any building, shall, within fifteen days, furnish a plan, showing the number and location of its poles, the cross-arms on each, the number of wires or cables thereto attached, or contained therein, the particular locations of all its ducts, conduits and manholes, and the usage to which the respective ducts in such conduits are, and hereafter may be put, with specification of the average volts, charges and current used, the tested strength, the kind and number of lamps or motors connected with any electrical circuit, and other electrical appliances, and, in general, the method of installation, operation, maintenance and repair. The plan shall be in form and size agreeable to the City Electrician.

(Prior code § 9-14)

Ask a question about Cambridge law

Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.