For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.30 — SPECIAL DISTRICT 3

Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Zoning Ordinance § 17.30

Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/8e74e110-79cb-4d4d-a735-1c61bc0ead98

17.30 - SPECIAL DISTRICT 3

17.31 Scope and Purpose. This Section 17.30 regulates development in Special District 3 as shown on the Zoning Map of the City of Cambridge, as amended. It is the intent of this Special District 3 to permit a modest level of residential and nonresidential development in the District consistent with the public interest in protecting regulated wetlands where they occur within the district; maintaining flood storage capacity in the district consistent with federal regulations; minimizing the amount of additional traffic passing through congested intersections on arterial streets, and on local, neighborhood streets, that could provide access to the district; limiting stormwater runoff onto property located outside the district ensuring adequate visual buffers and screening of buildings and parking facilities from adjacent public parks and recreation facilities; minimizing the disturbance of existing soil within the district to limit dispersal and exposure to possible harmful residual substances in the soil; and in enhancing the parkway character of the Parkway Overlay District. 17.32 Use Regulations. The following uses are allowed in the Special District 3. 17.32.1 Permitted Residential Uses. Section 4.32 - Residential Uses, Paragraphs a-I 17.32.2 Permitted Nonresidential Uses. Section 4.34 Office and Laboratory Use, Paragraphs a-f Section 4.33 Institutional Uses, all uses. Section 4.35 Retail or Consumer Service Establishments, Paragraph a, c, f-1, q-1, q-2, and r provided that no individual retail establishments exceeds one thousand and two hundred (1,200) square feet in gross floor area, except that a single retail establishment containing a grocery store or supermarket may total no more than fifty-five thousand (55,000) square feet provided that nothing in this section alters any other limitations as set forth in this district. 17.33 Dimensional Requirements. The following dimensional requirements shall apply in Special District 3. 17.33.1 Total Gross Floor Area Permitted 17.33.11 Total Development Permitted. The total Gross Floor Area (GFA) permitted in Special District 3 shall be seven hundred, eighty two thousand and five hundred (782,500) square feet, exclusive of Gross Floor Area occupied by the MBTA Red Line transit station and any structure in existence at the time of adoption of this Section 17.30 that is used exclusively for residential use. Total Gross Floor Area in the District is at any time the sum of the Gross Floor Area of all structures then located in the District (excepting the above described structures and those other structures required to be demolished prior to the issuance of a certificate of occupancy for any newly constructed building in the district) and those which are being constructed or may be constructed in the District pursuant to a then effective building permit. At no time may a building permit be issued for any structure that would result in the above Gross Floor Area limit for all structures in the District (excepting the above described structures and those other structures required to be demolished prior to the issuance of a certificate of occupancy for any newly constructed building in the District) being exceeded. Development within the District shall be further regulated as set forth below. 17.33.12 Allocation of GFA to Lots in Existence as of the Date of Adoption of this Section 17.30. In allocating the total permitted GFA within the district, each lot in existence as of the date of adoption of this Section 17.30 shall be allocated a minimum gross floor area equal to the allocation of a Floor Area Ratio of 0.45 to the lot area. No building permit shall be issued for any lot that would require the reduction of GFA allocated to any such existing lot below that which is allowed by the application of the FAR of 0.45 without the written consent by the owner of such existing lot. Future subdivision of any existing lot shall be permitted, but in no event shall the amount of GFA permitted on the original existing lot as set forth in this Section 17.33.12 be increased by such subdivision. For the purposes of this Section 17.33.12, a lot may consist of parcels of land held in separate ownership but developed as a single zoning lot. 17.33.13 Maximum Floor Area Ratio. There shall be no FAR limit with regard to the amount of GFA on any single lot within the District, subject to the total development limits set forth in Sections 17.33.11 and 17.33.12 above. Additional GFA above that permitted by the application of an FAR of 0.45 to any lot, may be constructed on any lot to the extent that the total amount of development (GFA) at the time within the entire Special District 3 is less than that permitted in Section 17.33.11 above. 17.33.2 [Deleted] 17.33.3 Minimum Lot Size and Minimum Lot Width. 1. The minimum lot size shall be twenty thousand (20,000) square feet. 2. There shall be a minimum width of one hundred (100) feet. 17.33.4 Minimum Yard Requirements. There shall be no minimum yard requirements in the district except as set forth below. 1. For those portions of a lot abutting Alewife Brook Parkway and Whittemore Avenue a minimum front yard setback of twenty-five (25) feet shall be required and it shall consist entirely of Green Area Open Space as defined in Article 2.000 with the exception of necessary driveways crossing the yard in a generally perpendicular manner to provide access to other portions of the lot. 2. For those portions of a lot abutting Rindge Avenue, any Open Space District, and any public park or recreation area, a minimum yard setback from that property line of fifty (50) feet shall be required. The first twenty-five (25) feet from the lot line of that required setback shall consist entirely of Green Area Open Space as defined in Article 2.000 with the exception of necessary driveways crossing the yard in a generally perpendicular manner to provide access to other portions of the lots. Notwithstanding any provision of Article 6.000, accessory parking, circulation and loading facilities shall be allowed within the second twenty-five (25) feet of the required setback where such setback is a front yard. 3. Notwithstanding the minimum yard requirements set forth in Paragraphs (1) and (2) above, the following yard setbacks shall be required for that portion of any new structure containing residential use; or for any new structure containing nonresidential uses that is within one hundred (100) feet of a lot containing a public park, recreation area, or a structure containing a residential use, or a residential or open space zoning district line: a side yard of (H+L)/7 and a rear yard of (H+L)/5. 4. Notwithstanding the minimum yard requirements set forth in Paragraph (1) above with respect to Whittemore Avenue, the buildings located on Whittemore Avenue existing at the time of adoption of this Section 17.30 shall be deemed to be in compliance with the minimum yard requirements of this Section 17.33.4. However, any alteration, reconstruction, extension, or structural change of such buildings shall be subject to the minimum yard requirements of Section 17.33.4 in the following circumstances: (a) The height or footprint of the existing building is increased or extended; (b) The installation of any loading bay or installation of any mechanical equipment on the roof that is otherwise exempt from the height limit or prohibited from any required yard; or (c) The demolition and reconstruction of more than twenty-five (25) percent of the area or volume of that portion of a building within the minimum yard required in Section 17.33.4. 17.33.5 Maximum Height. The maximum height in Special District 3 shall be fifty-five (55) feet for portions of buildings containing non-residential uses and 75 feet and six Stories Above Grade for residential uses except as modified below. 1. For that portion of a structure exceeding thirty-five (35) feet in height, a setback shall be required from any public park or recreation area equal to one and a half (1.5) feet for every foot of building height. 2. A maximum height of seventy (70) feet shall be permitted for portions of buildings containing non-residential uses within the following area bounded by: (a) A line parallel to and abutting the southerly façade of the structure known as the MBTA Red Line east headhouse; (b) A second line perpendicular to Line (a) and proceeding north from a point on line (a) one hundred and twenty (120) feet easterly of the southwesterly corner of the MBTA headhouse; (c) A third line proceeding in a westerly direction that is perpendicular to Line (b) and parallel to and three hundred and twenty (320) feet northerly of Line (a); and (d) The centerline of Alewife Brook Parkway. 17.34 Parking and Loading Requirements. The requirements of Article 6.000 shall apply in Special District 3 except as modified below. 17.34.1 Minimum Off Street Accessory Parking Requirements. There shall be no minimum parking requirement for any use within Special District 3. 17.34.2 Maximum Off Street Accessory Parking Requirements 1. No more than one thousand (1,000) parking spaces shall be permitted within Special District 3. That number may be increased by one paring space for each parking space, accessory to uses located within Special District 3 and in existence as of the date of adoption of this Section 17.30, that is removed permanently from Lots 7, 62, 70, 72, and 73 as shown on Assessor's Plat numbered 187, and Lots 25, 28, 29, 55, and 121 on Assessor's Plat numbered 188; the area occupied by such removed parking space shall remain unused or converted to any permitted residential use. 2. Parking facilities may be located in whole or in part in one or more pooled parking facilities located anywhere within Special District 3. 17.35 Required Open Space. Any combination of Private open space, Publicly Beneficial Open Space, or Green Area Open Space shall be provided on every lot and shall in the aggregate equal to at least twenty (20) percent of the area of such lot. Owners of lots within Special District 3 may pool such open space at any location within the District provided its permanency is guaranteed by dedication, easement, deed restriction covenant or comparable legal instrument. The surface area of the body of water known as Jerry's Pond shall not be included within the required open space. 17.36 Other Regulations. 17.36.1 Limitations on Construction Below Existing Grade. No portion of a building or structure, including parking structures, shall be located below the existing mean grade of the ground adjacent to the proposed building or structure prior to construction except as may be required to reasonably accommodate necessary utility systems and building foundations (e.g. elevator shafts, foundation pilings, etc.). 17.36.2 Limitations on Storm Water Runoff Beyond Property Lines. No net increase in the peak runoff rate of storm water beyond any property line shall be permitted as a consequence of any construction on a lot consistent with the state Department of Environmental Protection Stormwater management Policy. Property owners within the Special District may combine lots, retention areas and drainage facilities in meeting this requirement. Conformance with this requirement shall be certified by an engineer registered in the Commonwealth and competent to make such certification. 17.36.3 Access to Harvey Street. No building, structure, parking facility or access road within Special District 3 may have access to Harvey Street except as may be necessary for emergency vehicles. 17.36.4 Pedestrian and Bicycle Connections. Notwithstanding the provisions of Section 17.33.11, no building permit shall be issued that allows the total amount of development in the District (GFA) to exceed seven hundred and seven thousand and five hundred (707,500) square feet until a pedestrian and bike connection has been constructed, or the property owner has guaranteed such construction in a manner satisfactory to the City of Cambridge and prior to the issuance of any certificate of occupancy for space constructed pursuant to such building permit, within the District between the Linear Park and Whittemore Avenue in the vicinity of Madison Avenue, to a standard comparable to the improvements in the Linear Park and the Minuteman Bikeway. 17.36.5 Area of Special Planning Concern. Special District 3 shall be considered an area of Special Planning Concern. All development within the District shall comply with the development review procedures as specified in Article 19.000, except as modified below: 1. [Deleted] 2. The Public Advisory Consultation Procedure shall be modified so that the Community Development Department shall have ten (10) business days to certify that an application is complete, ten (10) business days from certification to hold a public meeting, and ten (10) business days thereafter to make a report. 3. In reviewing a proposal the Planning Board shall be guided by the provisions of the Design Guidelines for Special District 3. 17.36.6 Traffic Study. Before issuance of any building permit for construction of GFA within Special District 3, a Traffic Study shall be prepared and made available to the Planning Board for the applicable development review procedure as established in Article 19.000. The traffic study may be prepared for the total amount of development allowed in the District when the first building permit is requested and shall be applicable to all future building permits issued in the district except that traffic data shall be updated at least every five (5) years after the initial submission of the study whenever a new building permit is sought. The Traffic Study shall include the following elements. 1. A Transportation Demand Management Plan, which at a minimum shall include a program to subsidize transit passes for employees at the site in the amount of at least fifty (50) percent of the cost of such passes; joining the Alewife Transportation Management Association (TMA); provision of secure indoor bicycle parking, showers, and lockers/changing rooms; and reservation of ten (10) percent of available parking spaces for ridesharing commuters. 2. Data, which at a minimum, shall include current traffic volumes, projected future trip generation, distribution of trips on area roadway network, evaluation of roadway operations and safety, and identification of traffic operation and safety improvements. 3. A commitment to implement the provisions of the Transportation Demand Management Plan and a commitment of the proponent to work in a cooperative manner to assist the City in implementing a neighborhood protection plan including reasonable traffic mitigation measures such as institution of one way streets, traffic calming, signal timing changes and other traffic control measures and initiatives which may affect traffic flows relating to development in the District. 4. A procedure by which implementation of the recommendations in the plan will be periodically monitored and reported to the Planning Board. 17.37 Certification. Before issuance of any building permit for new Gross Floor Area within Special District 3 the following certifications shall be made to the Superintendent of Buildings. In making an application for a building permit the applicant shall provide all information necessary to determine whether the requirements of this Section 11.70 with regard to limitations on GFA are being met. 1. Certification from the Community Development Department that the applicable development review procedure has been applied and conducted in accordance with Article 19.000 of the Zoning Ordinance, and that all other requirements of the District have been met. 2. Certification from the Conservation Commission that the requirements of the state Wetlands Act with regard to flood storage retention and peak storm water runoff have been met, or alternatively, delivery of an outstanding Order of Conditions issued under the Wetlands Act. 3. Certification from the Community Development Department and the Department of Traffic, Parking and Transportation, in consultation with the Planning Board, that the Traffic Study has been prepared. 4. Certification by the Community Development Department that all other requirements of the District have been met. 5. Failure to issue such certification, or notice that the requirements have not been met, within twenty-five (25) days of application for a building permit shall be deemed to be positive certification. 17.38 Exemption from Section 11.500 . Section 11.500 of the Zoning Ordinance, adopted as Ordinance #1209, shall not apply to any construction in Special District 3 as regulated by this Section 17.30.

(Ord. No. 2021-3, § xix, 6-7-2021)

Ask a question about Cambridge law

Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.