§ 20.1000 — GRAND JUNCTION PATHWAY OVERLAY DISTRICT
Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Zoning Ordinance § 20.1000
Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/bb253677-c255-4f54-ba2d-0b6cbf780694
20.1000 - GRAND JUNCTION PATHWAY OVERLAY DISTRICT
20.1001 Establishment and Scope. There is hereby established the Grand Junction Pathway Overlay District, which is governed by the regulations and procedures specified in this Section 20.1000. It is the intent of this Section that these regulations will apply to land within the Grand Junction Pathway Overlay District, which is comprised of Grand Junction Land and Development Land, as defined below. 20.1002 Purpose. It is the purpose of the Grand Junction Pathway Overlay District to augment base zoning and promote the development of a public pathway along the Grand Junction railroad right-of-way in connection with high quality development consistent with development along the Binney Street corridor. The October 2001 East Cambridge Planning Study identified the Grand Junction corridor as a means to provide a significant transportation and recreational resource and enhance non-auto mobility in the City. The October 2006 Grand Junction Rail-with-Trail Feasibility Study highlighted the public benefits of the pathway, including recreation and open space, but noted that acquiring rights in the land to develop the pathway was a key limiting issue. The August 2017 Final Report of the Kendall Square Mobility Task Force underscored the importance of enhancing non-auto mobility in the City and the Grand Junction Pathway in meeting that goal. The Grand Junction Pathway Overlay District will facilitate the City's efforts to secure long term public access to certain land in the Grand Junction Pathway Overlay District by incenting development consistent with development along the Binney Street corridor. A project meeting the requirements of this Section will provide open space, recreational opportunities, a corridor for non-auto traffic in the City, as well as high quality development, and promote the goals of public health, safety, welfare and economic development. 20.1003 Applicability. Development in the Grand Junction Pathway Overlay District shall be controlled by the regulations governing the Industry A-1 District, except as modified by the requirements of this Section 20.1000, which shall apply in lieu of the regulations of the Industry A-1 District. Where the regulations applicable to the Industry A-1 District differ from the requirements of this Section 20.1000, the provisions of this Section shall apply. The Grand Junction Pathway Overlay District shall be established on the Zoning Map of the City of Cambridge pursuant to the provisions of Section 3.20. 20.1004 Procedure. Construction, use and development under this Section shall be authorized by Special Permit granted by the Planning Board. In granting a Special Permit under this Section 20.1000, the Planning Board shall find that the intent of this Section has been satisfied and find that provision has been made for the conveyance to the City, or a designee thereof, by fee or easement, of interests in certain land as described herein for the development of the Grand Junction pathway between Binney Street and Cambridge Street. 20.1005 Required Conveyance of Grand Junction Land. In connection with a Special Permit(s) granted pursuant to Section 20.1000, conveyance to the City, or its designee, of the following land for use on the Grand Junction pathway, by fee or easement, shall be required under such Special Permit(s) or have already been made: (a) Tax Parcel 37-88, comprising approximately 2,600 square feet, and known as 686 Cambridge Street; (b) A fourteen (14) foot wide strip of land along the east boundary of Tax Parcel 37-126, beginning at the north boundary of Tax Parcel 33-111 and continuing approximately 480 feet, and then the land between the east boundary of Tax Parcel 37-126 and the west boundary of Tax Parcel 37-88, continuing approximately fifty (50) feet to Cambridge Street, comprising a total of approximately 7,020 square feet; and (c) A fourteen (14) foot wide strip of land along the east boundary of Tax Parcel 33-110 bordering the Grand Junction railroad right-of-way beginning at Binney Street and continuing approximately 511 feet to the south boundary of Tax Parcel 33-111 and Tax Parcel 33-111, comprising a total of 19,916 square feet. The land described in subparagraphs (a)-(c) is hereby defined as "Grand Junction Land." 20.1006 Other Matters—Grand Junction Land. The Grand Junction Land shall be conveyed to the City, or its designee, by fee or easement: (i) such that the environmental condition of the Grand Junction Land poses No Significant Risk, as defined under 310 C.M.R. 40.0006, to future users of the land given its intended use as a public pathway; (ii) subject to encumbrances which do not interfere with the use of the land for its intended purpose; and (iii) subject to a reservation of Grantor to grant subsurface utility easements. Nonconformity, including setbacks, arising directly from the conveyance of Grand Junction Land hereunder is waived. 20.1007 Development Land. "Development Land" within the Grand Junction Pathway Overlay District consists of Tax Parcel 31-20 [known as 303 and 345 Binney Street], comprising a total of approximately 191,506 square feet ("Development Land Lot Area"). 20.1008 Permitted Uses. Uses permitted in the Development Land shall be governed by base zoning. After conveyance pursuant to Section 20.1011, Grand Junction Land shall be used for Public Open Space. 20.1009 Dimensional Requirements. 20.1009.1 Floor Area Ratio. The maximum Floor Area Ratio for the Development Land located in the underlying Industry A-1 District (130,671 square feet) shall be 2.5. Development Land in the underlying Residence C-1 District (60,835 square feet) may be included in the calculation of allowable Gross Floor Area on Development Land located in the Industry A-1 District (for Uses allowed therein) at the Floor Area Ratio allowed in the Industry A-1 District of 1.25, provided that: (i) future use of the Development Land in the Residence C-1 District shall be Publicly Beneficial Open Space, except that fences, berms, sound barriers, a vehicle turnaround, a loading dock enclosure and underground systems serving the Development Land may be located in the underlying Residence C-1 District; and (ii) a 25 foot wide landscaped buffer shall be created along the westerly boundary of that portion of the Development Land located in the Residence C-1 District abutting the railroad right-of-way. 20.1009.2 Height. As shown on the attached Figure of Height Zones for Development Land within the Grand Junction Pathway Overlay District, the Development Land is divided into three zones: the Binney Street Zone, the Transition Zone and the Base Zoning Zone. The maximum height of any building in the Binney Street Zone shall be 90 feet. The maximum height of any building in the Transition Zone shall be 60 feet. The maximum height of any building in the Base Zoning Zone shall be governed by base zoning. Notwithstanding Section 5.23 of the Cambridge Zoning Ordinance, the height of any Roof Top Mechanical Penthouse in the Binney Street Zone of the Grand Junction Pathway Overlay District shall be limited to twenty-five (25) feet and the height of any Roof Top Mechanical Penthouse in the Transition Zone of the Grand Junction Pathway Overlay District shall be limited to twenty (20) feet. "Roof Top Mechanical Penthouse" is defined as an enclosed space housing mechanical systems, air conditioning equipment, elevator bulkheads, ventilation systems or other necessary features normally built above the roof and not used for human occupancy. 20.1009.3 Setbacks. There shall be no minimum required front, rear or side yard setbacks, except that no above grade building shall be constructed within twenty-five (25) feet of the westerly boundary of Tax Parcel 31-20. 20.1010 Parking—Parking Ratio. Parking shall be at a ratio no greater than 0.8 spaces per 1,000 feet of Gross Floor Area for technical office for research development laboratory or research facility (see Section 4.34(f) of the Ordinance). 20.1011 Timing of Grand Junction Land Conveyance. The Grand Junction Land shall be conveyed to the City per Section 20.1005 in accordance with Section A(1) of that certain Letter of Commitment dated March 2, 2020 and referenced in Section 20.1013. 20.1012 Project Review. In granting approval for a building or buildings under Article 19, the Planning Board may approve buildings for which physical design information is presented in conceptual form, subject to later design review and approval by the Planning Board and a finding that final design of such building(s) is consistent with Section 19.30, as applicable. 20.1013 Letter of Commitment. Issuance of any base building permit or certificate of occupancy for any new building on Development Land approved pursuant to a Special Permit granted under this Section 20.1000 shall be conditioned on certification by all relevant departments of the City to the Superintendent of Buildings that the building is proceeding in accordance with that certain Letter of Commitment dated March 2, 2020.
(Ord. No. 1419, 3-2-2020)
Ask a question about Cambridge law
Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.
