§ 9.20 — CERTIFICATE OF OCCUPANCY

Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Zoning Ordinance § 9.20

Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/ab0e51ac-c7d9-490c-b109-2aaab2dabb15

9.20 - CERTIFICATE OF OCCUPANCY

9.21 No land shall be occupied or used, and no building or structure erected or structurally altered after January 25, 1944, shall be occupied or used, in whole or in part, for any purpose until a certificate of occupancy has been issued by the Superintendent of Buildings stating that the building and use comply with the provisions of the Zoning Ordinance of the City of Cambridge and of the State Building Code in effect at the time of issuance. No such certificate shall be issued unless the building and its use and its accessory uses and the uses of all premises are in conformance with the provisions of the Zoning Ordinance and of the State Building Code at the time of issuance. Where a certificate of occupancy was not issued at the time of occupancy or use permitted by the Zoning Ordinance and State Building Code in effect at such time began, the Superintendent of Buildings may issue a validating certificate of occupancy retroactive to the beginning of the occupancy of use. A certificate of occupancy shall be conditional on the adequacy of parking space and other facilities as required by this Ordinance and shall lapse if such space or spaces facilities are used for other purposes. 9.22 A certificate of occupancy shall be required for any of the following in conformity with the State Building Code and the Zoning Ordinance: (a) Occupancy and use of a building hereafter erected or structurally altered. (b) Change in use of an existing building to a use of a different classification. (c) Change in character or the intensity of the use of land. (d) Any change in use of a nonconforming structure or use. 9.23 In cases where a building permit is required, a certificate of occupancy shall be applied for at the time of the application for a building permit, and shall be issued within ten days after the lawful erection or alteration of the building is completed if the proposed use of the building is permitted by this Ordinance. In cases where a building permit is not required a certificate of occupancy shall be applied for prior to the happening of any of the events specified in Section 9.22 and shall be issued prior to any such change of use. Such certificates of occupancy shall be posted forthwith by the owner of the property in a conspicuous place on the premises involved for a period of not less than ten days after issuance. 9.24 Pending the issuance of a regular certificate of occupancy, a temporary certificate may be issued for such period as the Superintendent may designate, but not beyond the completion of the project described in the application for the building permit, provided there is compliance with the provisions of the Zoning Ordinance corresponding to the extent of occupancy. 9.25 The Superintendent of Buildings may issue a certificate of occupancy for a nonconforming use which is substituted for an existing nonconforming use of the same type (e.g. retail store for retail store, restaurant for lunch room) and for a nonconforming use which is substituted for an existing nonconforming use where such substitute use is permitted in Article 4.000 as a matter of right in the most restricted Residence district in which a similar such existing nonconforming use is permitted; provided there is no enlargement of volume or area and provided such substitution does not occasion any further violation of applicable regulations of this ordinance.

Ask a question about Cambridge law

Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.