§ 140-4 — Permit required to install meter or connect current
Code of Ordinances, City of Lowell, Massachusetts · Lowell Code of Ordinances § 140-4
Corpus is an independent public-information project, not the official City of Lowell website. Stable reference: corpuslaw.us/code/10770f85-9102-4c25-9031-89aca2828ac5
§ 140-4: Permit required to install meter or connect current.
No meter shall be installed nor shall a current of electricity be connected within any system or extension of wiring or apparatus intended to be used for lighting, heating or power until a permit to connect has been issued by the Electrical Division. Editor's Note: Amended at time of adoption of Code (see Ch. 1 , General Provisions, Art. II ).
Ask a question about Lowell law
Corpus searches the Lowell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
