§ 272-111 — Stormwater management permit requirements

Code of Ordinances, City of Lowell, Massachusetts · Lowell Code of Ordinances § 272-111

Corpus is an independent public-information project, not the official City of Lowell website. Stable reference: corpuslaw.us/code/880da01a-ff5d-4aa0-be2f-f53a16f2f270

§ 272-111: Stormwater management permit requirements.

A. To obtain a stormwater management permit, applicants must show that site design, construction site stormwater runoff control, and post-development stormwater management will meet the standards set by the enforcement authority in regulations, rules and guidance, which shall be at least as stringent as the relevant requirements of the City's NPDES stormwater discharge permit and may also address relevant environmental considerations, including (without limitation) aquifer and wetland protections, climate resiliency, combined sewer overflow mitigation, and flood prevention. Applicants seeking a stormwater management permit, at their own expense, shall make and file accurately the documents listed in § 272-111A(1) with the enforcement authority. (1) Required submittals. (a) Erosion and sedimentation control plan (ESCP). [1] Narratives and construction plan shall describe the actions to minimize disturbed areas; protection of natural resources; stabilization of soils across the sites during temporary cessation or completion; protection of slopes on site; usage of perimeter controls; ESC inspections; evaluation of measures to minimize erosion and sedimentation and topsoil compaction during construction; and controls of demolition debris, litter, and sanitary wastes. [2] Site plans depicting flows and planned BMPs for ESC in accordance with Massachusetts Department of Environmental Protection Stormwater Standards. (b) Stormwater management plan (SWMP). [1] Narrative explaining existing and proposed site conditions, measures to mitigate stormwater impacts, LID used, planned post-construction BMPs. [2] Site plans showing existing flow, site features, and stormwater management, proposed stormwater management systems, new flow regime, and limits of disturbances. [3] Considerations for potential water quality impacts. (c) Operation and maintenance plan. [1] Funding structure for future operation and maintenance. [2] Inspection and maintenance schedule. [3] Owner of the system and responsible parties for maintenance. [4] SOPs of structural and nonstructural BMPs. [5] Annual self-certification of operation and maintenance activities. (2) Post-development design standards. (a) Projects shall be designed to collect, treat, and convey stormwater runoff from the project site in accordance with Massachusetts Department of Environmental Protection Stormwater Management Standards. (b) Projects are encouraged to use LID techniques within stormwater management design to the maximum extent practicable to manage stormwater. (c) Stormwater management systems for new development or redevelopment sites shall be designed to meet an average annual pollutant removal in accordance with Massachusetts Department of Environmental Protection Stormwater Management Standards. Average annual pollutant removal requirements shall be achieved through a combination of the following methods: [1] Installing stormwater BMPs that meet the pollutant removal percentages based on calculations developed consistent with EPA Region 1's BMP Accounting and Tracking Tool (2016) or other BMP performance evaluation tools provided by EPA Region 1, where available. If EPA Region 1 tools do not address the planned or installed BMP performance, then any federally or state-approved BMP design guidance or performance standards (e.g., state stormwater handbooks and design guidance manuals) may be used to calculate BMP performance; or [2] Retaining the volume of runoff equivalent to, or greater than, one inch multiplied by the total post-construction impervious surface area on the new development site or retaining the volume of runoff equivalent to, or greater than, 0.8 inch multiplied by the total post-development impervious surface area on the redeveloped site. B. The enforcement authority may require from the applicant a surety or cash bond, or other means of security acceptable to the City, prior to the issuance of any stormwater management permit for land-disturbing activity. The amount of the security shall not be less than the total estimated construction cost of the stormwater management system, if one is being built, and shall be in an amount deemed sufficient by the enforcement authority to ensure accordance with the stormwater management permit. The bond so required in this section shall include provisions relative to forfeiture to the City for failure to complete work specified in the approved stormwater management plan, compliance with all provisions of this article, obligations imposed by the stormwater management permit, and other applicable laws and regulations, and any time limitations. The bond shall not be fully released without a final inspection of the completed work by the enforcement authority, submission of as-built plans, and certification that the complete work is in compliance with the approved plan and the provisions of this article by the enforcement authority. (1) If the project is phased, the enforcement authority may release part of the surety or cash bond, or other means of security acceptable to the City Treasurer, as each phase is completed in compliance with the permit. (2) Upon completion of work and no later than six months after completion of construction, the holder of a stormwater management permit shall submit a report and certified as-built construction plans from a professional engineer, surveyor or CPESC certifying that the project has been completed in accordance with the conditions of the stormwater management permit. As-builts must depict all on-site controls, both structural and nonstructural, that manage the post-development stormwater. All discrepancies with the approved permit plan shall be noted in the report and as-built plans. (3) The enforcement authority shall issue a letter certifying project and permit completion upon receipt and approval of the final report and as-builts or confirmation that all work has been done in accordance with this article and stormwater management permit conditions.

Ask a question about Lowell law

Corpus searches the Lowell sections it holds and shows the ones that match, with their citations. Free, no sign-in.