§ 10-105 — Definitions
Revised Ordinances of the City of Medford, Massachusetts (Codified through Ordinance No. 889, adopted April 16, 2024. (Supp. No. 18)) · Medford Revised Ordinances § 10-105
Corpus is an independent public-information project, not the official City of Medford website. Stable reference: corpuslaw.us/code/84e255da-03c7-4854-9ac9-2d70f37bd2c4
Sec. 10-105. - Definitions.
Solar energy system: A device or structural design feature, a substantial purpose of which is to provide for the collection, storage and distribution of solar energy for space heating or cooling, electricity generation, or water heating. (1) Solar energy system, active: A solar energy system whose primary purpose is to harvest energy by transforming solar energy into another form of energy or transferring heat from a collector to another medium using mechanical, electrical, or chemical means. (2) Solar energy system, ground-mounted/canopy: An active solar energy system that is structurally mounted to the ground and is not roof-mounted. (3) Solar energy system, roof-mounted. An active solar energy system that is structurally mounted to the roof of a building or structure. Solar-ready zone: The solar-ready zone area is 50 percent of the roof area that is either flat or oriented between 110 degrees and 270 degrees of true north, exclusive of mandatory access or set back areas as required by the MA Fire Code. Substantial rehabilitation means to cause alterations or repairs to be made, to a structure or structures; costing in excess of 50 percent of the assessed value for property tax purposes. Assessed value of a structure or structures shall be based on the assessed value as recorded on the assessment rolls of the city as of the first of January preceding the date of the building permit application.
(Ord. No. 848, 10-22-2019)
Ask a question about Medford law
Corpus searches the Medford sections it holds and shows the ones that match, with their citations. Free, no sign-in.
