Sec. 6-112. - Permits for buildings, earthworks, street openings and utility installation.
(a) Buildings and earthworks. (1) All permits issued by the building commissioner for earth displacement and land clearing activities on residential and commercial property will be subject to a separate fee designated for rodent control. Such fees are to be set by the Medford City Council and reviewed at the request of the board of health. (2) In addition to the fee required above, building permits issued for certain activities will require the implementation of an integrated pest management plan as a condition of the permit. IPM plans must be submitted to the health department and implemented a minimum of 14 days prior to the start of the project. IPM plans will be required for: a. Demolition. b. Renovation or construction work on abandoned properties. c. Large-scale commercial projects valued at over $1,000,000. d. Construction of residential subdivisions. (3) Responsibility for pest prevention and management remains with the permit holder, even when a commercial service is part of the permit holder's IPM program. (b) Permits for street openings and utility installation. (1) All permits issued by the department of public works for the following activities will be subject to a separate fee designated for rodent control. Such fees are to be set by the Medford City Council and reviewed every three (3) years. a. The disturbance of an existing underground utility within the paved right-of- way of a distance greater than 500 linear feet; b. The installation of a new underground utility within the paved right-of-way greater than 500 linear feet; c. The disturbance of an existing underground utility outside of the paved right-of way greater than 250 feet; d. The installation of a new underground utility outside of the paved right-of- way greater than 250 feet; (2) In addition to the fee required above, permits issued by the department of public works for the following activities will require the implementation of an integrated pest management plan as a condition of the permit. IPM plans must be submitted to the health department and implemented a minimum of 14 days prior to the start of the project. The 14-day advance period may be waived by the director of the department of public works in emergency situations. IPM plans will be required for: a. The disturbance of an existing underground utility within the paved right-of- way of a distance greater than 1,500 linear feet; b. The installation of a new underground utility within the paved right-of-way greater than 1,500 linear feet; c. The disturbance of an existing underground utility outside of the paved right-of way greater than 750 feet; d. The installation of a new underground utility outside of the paved right-of- way greater than 750 feet; (3) Disturbance shall be defined as excavating the earth immediately around an existing utility. The length of disturbance shall be measured by the overall linear length of excavation required to unearth the utility. Activities that do not require the excavation of soil shall not be considered disturbance for the purposes of this article. (4) Responsibility for pest prevention and management remains with the permit holder, even when a commercial service is part of the permit holder's IPM program.
(Ord. No. 858, 3-2-2021)