§ 94-11.7 — Site plan review
Revised Ordinances of the City of Medford, Massachusetts (Codified through Ordinance No. 889, adopted April 16, 2024. (Supp. No. 18)) · Medford Revised Ordinances § 94-11.7
Corpus is an independent public-information project, not the official City of Medford website. Stable reference: corpuslaw.us/code/4bebafb5-c11b-42b7-bca7-4f7328082962
Sec. 94-11.7. - Site plan review.
94-11.7.1 Purpose. The purpose of this section is to provide a comprehensive review procedure for construction projects which will have significant impacts on the city, herein defined, to ensure compliance with the goals and objectives of the city, and the provisions of this chapter, to minimize adverse impacts of such development, and to promote development which is harmonious with surrounding areas; in particular to assure proper drainage, safe access, adequate parking and loading spaces, public convenience and safety and adequate consideration of abutting land owners. 94-11.7.2 Applicability. Site plan review shall be required for any major project. For the purposes of this section, the term "major project" shall mean: 1. Residential projects containing six or more units; including conversions of existing dwellings to contain six or more units; 2. Nonresidential projects which involve new construction of 10,000 square feet or more of floor area, or the addition of 10,000 square feet or more of gross floor area; 3. Projects which involve a change in principal use of an existing building containing 10,000 square feet or more of floor area; 4. Parking lots, including municipal lots, not accessory to principal uses; 5. Drive-in eating places; 6. Eating places other than drive in eating places with more than 5,000 square feet of floor area; 7. Medical offices containing 10,000 square feet or more of gross floor area; and 8. Gasoline service stations. 9. Neighborhood and convenience retail sales. 94-11.7.3 Timing. A site plan review shall be performed for each major project prior to the filing of an application for a building permit. 94-11.7.4 Review by community development board. 1. In the case of a major project which requires a special permit from the board of appeals or city council, the community development board shall perform a site plan review and submit its recommendations to the city council or board of appeals within 45 days of the date of filing with the community development board. Otherwise, failure to make such recommendations shall be deemed a lack of opposition thereto. In the event the public hearing is held prior to the expiration of the 45-day period, the board of appeals or city council shall continue the hearing to permit the submission of recommendations within that period. The decision of the board of appeals or city council shall contain explanatory reasons for its action if it is contrary to the recommendations of the community development board. 2. In the case of a major project not requiring a special permit under the Table of Use Regulations and Off-Street Parking, the community development board shall serve as the site plan review authority, shall conduct a public hearing in accordance with M.G.L.A. c. 40A, § 11, and file its written decision, reached by majority vote of the board as constituted, with the city clerk within 90 days after the close of the public hearing. Failure to file a decision within said 90-day period shall constitute approval of the site plan. 94-11.7.5 Procedures. Application for site plan review shall be made to the office of community development on forms provided for that purpose, accompanied by the required fee. The community development board shall adopt specific rules governing application and fee. when the application has been received in a completed form as designated by such rules, a copy shall be forwarded to the city clerk. The stamp of this city clerk shall designate the date of filing. Copies of the application shall be distributed to those boards and departments as specified in the aforementioned rules, which shall include, but not be limited to the department of public works, the board of health, the city engineer, the conservation commission, and the Medford Historical Commission. Those designated boards shall, within 35 days, review the application and make recommendations in writing to the community development board. Failure of the designated boards to make recommendations within 35 days of receipt of the applications shall be deemed lack of opposition. 1. In the case of major project which requires a special permit from the city council or board of appeals as identified in section 94-148, Table of Use Regulations, three copies of the above site plan review application shall be provided by the applicant and submitted to the community development board at the same time application is made to the city council or board of appeals for a special permit. 94-11.7.6 Application. The application for site plan review shall be accompanied by written statements, site plans, drawings, maps showing scale and north point, and supporting documentation as set forth below. 94-11.7.7 Site Plan. The application shall include a site plan, prepared by a registered architect, landscape architect, or professional engineer, with the following information: 1. Scale and north point; 2. Name and address of applicant and name of proposed project; 3. Total land area of the site and boundaries of the site; 4. Locus plan; 5. Present and proposed use of the land and existing buildings, if any; 6. Location and use of structures within 100 feet of property line; 7. Locations, elevations, and dimensions of existing and proposed building(s) or other structures, showing setback(s) from property lines; 8. Locations and dimensions of any easement and public or private rights-of-way, existing or proposed; 9. Wetlands, ponds and surface water bodies, as defined under the Wetlands Protection Act, M.G.L.A. c. 131, § 40, and rules promulgated therein, 310 CMR 10.00; 10. Existing proposed contour elevations in one foot increments; 11. Proposed surfacing; 12. Parking and loading areas; 13. Driveways and access to site; and evidence of the ability of site to handle emergency vehicles; 14. Facilities for vehicular and pedestrian circulation; 15. Locations of existing and proposed on-site public utilities and facilities (water, sewerage, and drainage) showing size and direction of flows; 16. Landscaping and screening, including trees, stone walls, fences and other features to be retained or removed; 17. Outdoor lighting, including location and intensity of lighting facilities; 18. Signs, proposed and existing; 19. Location and significance of historic structures. 94-11.7.8 Written Statement. The application shall include a written statement with the following information: 1. Description of the proposed uses to be located on the site, including quantity and type of residential units, if any; 2. The total land area of the site, and the total floor area and ground coverage of each proposed building and structure; 3. General summary of existing and proposed easements or other burdens now existing or to be placed on the property; 4. Method for handling solid waste disposal, and for screening of disposal facilities; 5. Estimates, including calculations, of demand for water, sewage flow requirements, and drainage facilities requirements; 6. The applicant's evaluation of the availability of off-site public facilities, including sewer, and water; 7. A description of any problems of drainage or topography, or a representation that, in the opinion of the applicant, there are none; 8. Measures taken to preserve and protect natural resources; 9. Estimated peak hour traffic volumes generated by the proposed use in relation to existing volumes and projected future conditions; 10. An estimate of the time period required for completion of the development; 11. Other information as may be necessary to determine compliance with the provisions of this chapter. 94-11.7.9 Waiver of Technical Compliance. The community development board may, upon written request of the applicant, waive any of the technical requirements of this section where the project involves relatively simple development plans. 94-11.7.10 Standards for Approval. The special permit granting authority or community development board shall approve a site plan if consistent with section 94-6.4, and after making the following written findings with respect to the proposed development: 1. The provisions for vehicular loading and unloading and parking and for vehicular and pedestrian circulation on the site and into adjacent public streets and ways will not create hazards to safety, or impose a significant burden upon public facilities; 2. The bulk, location or height of proposed buildings and structures and paved areas and the proposed uses thereof will be not detrimental to other private development in the neighborhood and will not impose undue burdens on the sewers, sanitary and storm drains, water distribution system, or similar public facilities; 3. The provision for on-site landscaping provides adequate protection to neighboring properties from potentially detrimental features of the development; 4. The site plan provides adequate protection of natural resources and the development will not result in soil or drainage problems; 5. The provisions for exterior lighting will not create undue hazards to motorists traveling on adjacent public streets or damage the value and diminish the usability of adjacent properties; 6. The proposed development will not create undue fire safety hazards by providing adequate access to the site, or to the buildings on the site, for emergency vehicles; 7. The provisions for the handling of refuse provides for adequate protection to neighboring properties. 94-11.7.11 Decision. The community development board may approve, approve with conditions, or deny an application for site plan approval when acting as the site plan approval authority; provided, however, that any denial of an application shall be predicated only upon applicant's failure to provide necessary information. The community development board may recommend approval or approval with conditions when the board of appeals or city council is acting as the special permit granting authority. Any conditions, limitations, and safeguards necessary to assure the project meets the criteria of section 94-11.7.10 may be imposed or recommended, as the case may be. The board shall file a written decision with the city clerk within 90 days of the close of the public hearing. Failure to file a decision within said 90-day period shall constitute approval of the site plan. 94-11.7.12 Regulations. The community development board may adopt rules and regulations for the administration of this section. 94-11.7.13 Fees. The community development board may adopt reasonable administrative fees and technical review fees for applications for special permits. 94-11.7.14 Lapse. Site plan approval shall lapse if a substantial use thereof or construction thereunder has not begun, except for good cause, within 24 months following the filing of the decision (plus such time required to pursue or await the determination of an appeal referred to in M.G.L.A. c. 40A, § 17, from the grant thereof) with the city clerk. 94-11.7.15 Appeal. The decision of the community development board when acting as the site plan review authority may be appealed within 20 days of the filing of the decision with the city clerk in accordance with M.G.L.A. c. 40A, § 17 to a court of competent jurisdiction. 94-11.7.16 Modifications. If at any time before or during development, it becomes necessary or desirable to make modifications to an approved site plan for a major project, the community development board may approve such modifications provided that they do not amount to a waiver or substantial alteration of any condition or requirement of the community development board.
Ask a question about Medford law
Corpus searches the Medford sections it holds and shows the ones that match, with their citations. Free, no sign-in.