§ 16-134 — Scope and applicability
Code of Ordinances of the City of New Bedford, Massachusetts (Codified through Ordinance of August 21, 2025. (Supp. No. 19)) · New Bedford Municipal Code § 16-134
Corpus is an independent public-information project, not the official City of New Bedford website. Stable reference: corpuslaw.us/code/cdf3d680-b6be-4a49-9208-7641440e7c44
Sec. 16-134. - Scope and applicability.
(a) No person shall alter land within the City of New Bedford without having obtained a stormwater management permit (SMP). The storm water authority may seek input from city departments during the review of a storm water permit application. City departments shall provide input to the storm water authority, upon request. (1) New development. a. Except as expressly provided herein, stormwater runoff from all industrial, commercial, institutional, office, residential, roadway, and transportation projects, including site preparation, construction, and additions/expansions, and all point source and nonpoint source stormwater discharges from said projects shall be managed according to the stormwater rules and regulations and shall require a SMP. b. Linear projects, including those not more than ten (10) feet in width, including footpaths, bikepaths, and other paths for pedestrian and/or non-motorized vehicle access, shall also meet the stormwater rules and regulations and shall require a SMP. (2) Redevelopment. a. Except as expressly provided herein, stormwater from all redevelopment projects as defined in section 16-133. Definitions of this ordinance shall be managed according to the stormwater rules and regulations and shall require a SMP. (b) Exemptions. No person shall alter land within the City of New Bedford without having obtained a SMP with the following exceptions: (1) Normal maintenance and improvement of land in agricultural use as defined by the Wetlands Protection Act 310 CMR 10.04 and M.G.L.A. c. 40A § 3; (2) Maintenance of existing landscaping, gardens or lawn areas; (3) Any work or projects for which all necessary approvals and permits have been issued before the effective date of this ordinance; (4) Repair or replacement of an existing roof, if said roof contains four thousand (4,000) square feet or less; (5) The construction or repair of any fence or wall that will not alter the existing terrain or drainage patterns; (6) Construction of a garage, addition, pool, or accessory building/structure (e.g. shed) of five hundred (500) square feet or less on parcels that contain up to six-family dwelling units. (7) Construction of utilities (gas, water, electric, telephone, etc.) other than drainage, which will not permanently alter terrain, ground cover, or drainage patterns; (8) Emergency repairs (as defined in section 16-133, Definitions) that pose a threat to public health, safety, the environment, provided notification is given to the stormwater authority within twenty-four (24) hours of said repair and all required environmental protection, while performing said repair, is followed; or as deemed necessary by the City of New Bedford; provided that the original design location, size, and technology of such facility remain the same. Any work conducted beyond that necessary to abate the emergency shall require the filing of a SMP. No work may be authorized beyond thirty (30) business days from the date of notification to the stormwater authority without written approval from the stormwater authority. (9) Work performed by the City of New Bedford; (10) New residential driveways that are constructed with porous asphalt, permeable pavers, and pervious concrete or existing residential driveways that are repaved within the same footprint.
(Ord. of 11-4-15, § 1)
Ask a question about New Bedford law
Corpus searches the New Bedford sections it holds and shows the ones that match, with their citations. Free, no sign-in.
