§ 16-32 — Industrial pretreatment and permit requirements
Code of Ordinances of the City of New Bedford, Massachusetts (Codified through Ordinance of August 21, 2025. (Supp. No. 19)) · New Bedford Municipal Code § 16-32
Corpus is an independent public-information project, not the official City of New Bedford website. Stable reference: corpuslaw.us/code/352012cb-30af-4ac3-b648-5a851c82854f
Sec. 16-32. - Industrial pretreatment and permit requirements.
(a) All persons discharging into the public sewer system shall comply with applicable requirements of federal, state and local industrial pretreatment standards. Industrial users shall comply with federal, state and local pretreatment standards and applicable categorical pretreatment standards. The categorical pretreatment standards found in 40 CFR Chapter I, Subchapter N, parts 405-471 are hereby incorporated by reference. Certain users are now or shall become subject to categorical pretreatment standards promulgated by the EPA, specifying quantities or concentrations of pollutant properties which may be discharged to the POTW. (b) The commissioner may immediately halt or prevent any discharge of pollutants reasonably appearing to present an imminent endangerment to the health and welfare of persons, or any discharge presenting, or which may present, an endangerment to the environment, or which threatens to interfere with operation of the city's sewage works. (c) Actions which the commissioner may take to effect the above, include, but are not limited to, seeking ex parte temporary injunctive relief, entry on private property, blockage of a private sewer to halt such discharge, or demand of specific action by the discharger, etc. (d) In those instances where a discharge presents an imminent endangerment to the health and welfare of persons, the commissioner shall make informal notice to the discharger. Otherwise the commissioner shall provide the discharger with formal notice, and shall provide an opportunity for correction of the discharge. (e) The commissioner shall notify industrial users of categorical pretreatment standards and any applicable requirements under Section 204(d) and 405 of the Clean Water Act (33 U.S.C. 466 et seq.) and subtitles C and D of the Resource Recovery and Conservation Act, as amended (42 USC 4901 et seq.). (f) The commissioner shall randomly sample and analyze the discharge of industrial users and conduct monitoring and inspection activities to identify, independent of information supplied by such persons, occasional and continuing noncompliance with this article (as amended). The commissioner shall comply with the public participation requirements of 40 CFR Part 25 in the enforcement of industrial pretreatment standards and requirements. (g) All industrial users must apply for an industrial discharge permit. Such application shall be made by completing a form developed by the commissioner. The permit shall contain, at a minimum, the following five (5) conditions: (1) a statement of duration; (2) a statement of nontransferability; (3) applicable federal, state and local effluent limits; (4) self-monitoring, sampling, reporting, notification, and record keeping requirements; and (5) a statement of applicable civil and criminal penalties. No industrial user shall discharge to the POTW without an industrial discharge permit and shall conform to the conditions of this permit. The terms of an industrial permit may be modified by the commissioner and a reasonable time period will be provided for compliance with modifications. Violation of any of the conditions of the permit are violations of this ordinance. Any existing industrial user located outside of New Bedford, yet discharging into New Bedford's collection system, shall submit a wastewater discharge permit application in accordance within this ordinance. The commissioner may enter into an agreement with the neighboring jurisdiction in which the industrial user is located to provide for the implementation and enforcement of pretreatment program requirements against said industrial user. (h) All new industrial users shall apply for an industrial discharge permit at least sixty (60) calendar days before connecting to the city's sewage works. As part of such application, the commissioner may require the applicant to obtain written certification from the appropriate federal and state regulatory agencies as to whether the applicant falls within particular industrial categories or subcategories for purposes of industrial pretreatment standards. (i) Within ninety (90) calendar days after the adoption by a federal or state regulatory agency of a categorical pretreatment standard, existing industrial users subject to such standards shall submit a categorical discharge permit application containing information required under applicable federal and state industrial pretreatment reporting regulations in the form required by the commissioner. (Such categorical discharge permit application is in addition to the industrial discharge permit application required above.) such information, at a minimum, shall include: (1) The name and address of the facility, including the name of the operators and owners; (2) A list of all environmental permits held by or for the facility; (3) A brief description of the nature, average rate of production, and standard industrial classification of the operations carried out at such facility; (4) A statement reviewed by an authorized representative of the IU, and certified by a qualified professional about the user's compliance with applicable categorical standards and whether any pretreatment or O & M (schedule included) is required to attain compliance; (5) Information showing the measured average daily and maximum daily flow, in gallons per day, to the public sewer from regulated process streams and from other streams; (6) An identification of the industrial pretreatment standards applicable to each regulated process; and (7) An analysis identifying the nature and concentration of pollutants in the discharge; The commissioner may require additional information to be included in such permit application. (j) Beginning one hundred eighty (180) calendar days after the adoption of federal or state categorical pretreatment standards, industrial users subject to such categorical pretreatment standards may not discharge industrial wastes from processes regulated by such categorical standards to a public sewer, unless a categorical discharge permit application is approved by the commissioner and the terms of any permit modification are being met; (k) Within ninety (90) days after the date for final compliance by existing industrial users with applicable categorical pretreatment standards, or in the case of a new source, following commencement of the introduction of wastewater into the public sewer, as well as any noncategorical significant industry, such industrial users shall submit a report indicating the nature and concentration of pollutants in the discharge from the regulated process(es) governed by categorical pretreatment standards and the average and maximum daily flow for these process units. Such report shall state whether the applicable pretreatment standards are being met on a consistent basis and, if not, what additional operation and maintenance practices or pretreatment is necessary. Such industrial users shall also submit a report to the city before June 30 and December 30 each year, unless required more frequently by the commissioner. The report shall indicate the nature and concentration of pollutants in the discharge which are limited by a pretreatment standard and include a record of measured or estimated average daily flows. The report shall be reviewed by an authorized representative of the IU and verified by a qualified professional. Industrial users shall immediately notify the commissioner of any slug or any discharge with the potential to adversely affect the POTW, discharged by such user. In addition, all IU's must notify (in writing) the POTW, the state and EPA of any discharge which would be considered a hazardous waste, if disposed of in a different manner. The city has the legal authority to require any siu to develop a slug control plan, outlining discharge practices; describing stored chemicals; and containing procedures to notify the POTW immediately of slug discharges. Requirements for reports and applications, shall be as follows: (1) All reports and applications (to include, but not limited to, BMR's, ninety-day compliance reports and periodic compliance reports) must be signed by an authorized representative, attesting to the integrity of the analytical data submitted. An authorized representative may be: i. A principal executive officer of at least a level of vice president, if the industrial user is a corporation; ii. A general partner or the proprietor, if the industrial user is a partnership or sole proprietorship; or iii. A duly authorized representative of either of the individuals designated above, if such representative is responsible for the overall operation of the subject facility. (2) Some industries may, at the discretion of the commissioner, be required to perform self-monitoring based on process changes or the nature and/or quantity of wastewater discharge. In the event that an industry is required to perform self-monitoring, the industry shall at all times maintain in good working order all treatment and control facilities. The industry shall take all reasonable steps to minimize any adverse impact to the city sewer system resulting from noncompliance. If the industry monitors any pollutant more frequently than required, this monitoring shall be submitted upon request by the commissioner. If sampling by an IU indicates a violation, the user must notify the POTW within twenty-four (24) hours of becoming aware of the violation. The user must also resample and submit results of this resampling to the POTW within thirty (30) days. All user reports must be signed by an authorized representative of the user and contain the following certification statement: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. (3) Industrial users subject to the reporting requirement of this ordinance shall maintain records of information resulting from monitoring activities required to prepare such reports. Such records shall be maintained for a minimum of three years, or longer in the case of unresolved litigation or when requested by the commissioner. All pollutant analyses, including sampling techniques, shall be performed in accordance with 40 CFR 136. If 40 CFR 136 does not include sampling or analytical techniques for the pollutants in question, sampling and analyses shall be by other such procedures as are required or approved by the US EPA. All self-monitoring reports must, at a minimum, contain the following: i. The date, exact place, method and time of sampling and the names of the person or persons taking the sample; ii. The dates analyses were performed; iii. The name(s) of the person(s) performing the analyses; iv. The analytical techniques and methods used, as stipulated in 40 CFR part 136; v. The results of such analyses; vi. A record of the flow, in gallons, during the sampling event; vii. The applicable chain of custody of the sampling event; viii. A certification statement, declaring under penalty of perjury, that the monitoring samples were collected an analyzed in accordance with 40 CFR Part 136. Such records shall be maintained for a minimum of three (3) years and shall be made available for inspection and copying by the commissioner. (l) Information and data submitted to the commissioner under this ordinance shall be available to the public without restriction, unless the person providing such information demonstrates to the commissioner's satisfaction that release of such information would divulge processes or methods of production entitled to protection as trade secrets. Information protected as trade secrets shall not be available to the public, but shall be available upon the written request of governmental agencies for use regarding this ordinance, national pollutant discharge elimination system (NPDES) permits, any state disposal system permits, or the industrial pretreatment program. Wastewater constituents and characteristics shall not be protected as trade secrets. Other such information shall be available to the public at least to the extent provided by 40 CFR Section 2.302. (m) Permits issued under this section shall be valid for a period of one to five (5) years, depending on the site specific IU circumstance. Applications to renew a permit shall be submitted not less than ninety (90) days prior to the expiration date on the existing permit. Applications, in all instances, shall be accompanied by the full amount of the fee. Permits issued under this ordinance are nontransferable. All permitted industrial users shall notify the commissioner of any relocation or termination of the need for a permit. Failure to comply with any terms of the permit may be cause for revocation of the permit. (n) Industrial users shall design, construct, operate and maintain wastewater treatment facilities whenever necessary to achieve compliance, within specified time limitations. Such pretreatment facilities shall be maintained by the user at his/her expense, in proper working condition at all times. (o) All drawings, proposals, plans, specifications, treatability studies, operating procedures, and reports for such wastewater pretreatment facilities shall be submitted to the commissioner for review in accordance with accepted engineering practices. Prior to beginning construction of said pretreatment facility, the user shall also secure such building, plumbing, or other permits required by the city. The users shall construct said pretreatment facility within the time frame provided in the user's wastewater discharge permit.
Ask a question about New Bedford law
Corpus searches the New Bedford sections it holds and shows the ones that match, with their citations. Free, no sign-in.
