§ 22-103 — Permitting requirements
Code of Ordinances of the City of New Bedford, Massachusetts (Codified through Ordinance of August 21, 2025. (Supp. No. 19)) · New Bedford Municipal Code § 22-103
Corpus is an independent public-information project, not the official City of New Bedford website. Stable reference: corpuslaw.us/code/74a698fd-c91d-46d3-b539-1b9a27289cff
Sec. 22-103. - Permitting requirements.
(1) No person shall, except in an emergency, make a trench excavation, in any public way, public property, or privately owned land until a permit is obtained from the department of public infrastructure. (2) Issuance of permit. (a) The permit holder shall be responsible for obtaining the appropriate permit for the excavation of trenches for each project from the department of public infrastructure. (b) Any individual or entity creating a trench on property that is owned or controlled by the City of New Bedford or that the City of New Bedford otherwise has a property interest in, including but not limited to an easement, shall obtain a permit from the City of New Bedford unless the permitting authority is otherwise designated through a written agreement. (c) The department of public infrastructure shall electronically notify the department of public safety of the permit's issuance and shall provide the following information: i. The location of the excavation indicated on the permit; ii. The anticipated date to begin the trench operation; iii. The anticipated date to conclude the trench operation; iv. The name of the permit holder; and v. The name of the competent person(s). (d) When issuing a permit under this section, the department of public infrastructure shall attach a summary of OSHA Regulation 1926 Subpart P-Excavations and a summary of any regulation promulgated by the Department of Public Safety in conjunction with the Division of Occupational Safety in accordance with M.G.L. c. 82A. (3) Permit requirements. In order to obtain a permit, the following information must be submitted to the department of public infrastructure: (a) Completed application; (b) Certificate of insurance; (c) Required fee in accordance with section 22-103(6) where applicable. (4) Contents of permit applications. All permit applications must contain the following information: (a) Digsafe number (see sample permit); (b) Name and contact information of permit holder; (c) Name and contact information of the excavator; (d) Name of the competent person(s); (e) Name of person(s) performing the excavation of the trench; (f) Massachusetts Hoisting License number, license grade and expiration date of the person(s) performing the excavation of the trench; (g) Permit expiration date (if applicable); (h) Specific location of the trench; (i) Name and contact information of insurer; (j) All permit applications shall also include the following statements pursuant to M.G.L. c. 82A § 3(3) and (5)(i), (ii): 1. "Persons engaging in any trenching operation shall familiarize themselves with the federal safety standards promulgated by the Occupational Safety and Health Administration on excavations: 29 CFR 1926.650 et. seq., entitled Subpart P Excavations." 2. "By applying for, accepting and signing this permit, the applicant attests to the following: (i) that he has read and understood the regulations promulgated by the department of public safety with regard to trench safety; (ii) that he has read and understood the federal safety standards promulgated by the Occupational Safety and Health Administration on excavations: 29 CFR 1926.650 et. seq., entitled Subpart P "Excavations". (5) Posting. All permits issued pursuant to this regulation shall be posted in plain view on the site of the trench. All permits shall be made available to the department of public infrastructure, any investigator from the Division of Occupational Safety, any inspector of the department of public safety, or any other lawfully authorized authority. (6) Permit fees. In accordance with Chapter 82A, § 2, the department of public infrastructure may charge a reasonable fee to cover the administrative costs incurred by the authority in connection with the review and processing of permits.
(Ord. of 1-14-09, § 1)
Ask a question about New Bedford law
Corpus searches the New Bedford sections it holds and shows the ones that match, with their citations. Free, no sign-in.
