For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 175-3 — New construction and additions to buildings other than one- and two-family dwellings

Code of Ordinances, City of Springfield, Massachusetts (Code 2025-12-15) · Springfield Code of Ordinances § 175-3

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/8b498227-393f-4907-aeb5-96291652e9f5

§ 175-3: New construction and additions to buildings other than one- and two-family dwellings.

A. The fee for a building permit for the erection of, or the addition to, a building or other structure shall be based upon the square footage per R.S. Means costs (annual edition), including basement or cellar as determined by the following use groups which are classified and defined in the Massachusetts State Building Code: (1) A minimum of $100 or $10 per 1,000 per R.S. Means square foot costs (per annual edition): (a) Group A, Assembly. (b) Group B, Business. (c) Group E, Educational. (d) Group F, Factory and Industrial. (e) Group H, High Hazard. (f) Group I, Institutional. (g) Group M, Mercantile. (h) Group R, Residential. (i) Group S, Storage. (j) Group U, Utility and Miscellaneous. B. The minimum fee for a permit for the use and occupancy listed in this section shall be $75. C. The minimum fee for a permit for a temporary use and occupancy listed in this section shall be $50. D. The minimum fee for roofing commercial buildings shall be $75 and $0.05 per square foot. E. The minimum fee for multiresidence repairs shall be $75 and $0.48 per square foot.

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.