§ 300-18 — Construction requirements
Code of Ordinances, City of Springfield, Massachusetts (Code 2025-12-15) · Springfield Code of Ordinances § 300-18
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/5f474538-f8dd-4a2f-bec1-ff27a262217a
§ 300-18: Construction requirements.
A. The size, slope, alignment and materials of construction of a sewer, and the methods to be used in excavating, placing the pipe, jointing, testing, and backfilling the trench, shall conform to the applicable rules and regulations of the Director of Public Works. The private sewer or building sewer shall not be connected to the public sewer prior to certification by the Director that the entire sewer has been properly constructed, inspected for conformance, and tested, and is ready for use. In the absence of specific rules and regulations or in amplification thereof, the materials and procedures set forth in appropriate specifications of the latest edition of the ASTM and WPCF Manual of Practice No. 9, on file with the Director, shall apply. B. All excavations for sewer installation shall be adequately guarded by the licensed contractor with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways, and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the Director of Public Works. C. No person or persons shall construct a building sewer or a private sewer without first obtaining the appropriate permit from the Director of Public Works. The Director reserves the right to install any building sewer or private sewer with City forces.
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.