§ 300-60: Capacity charge to be paid by commercial and industrial users.
A. A one-time capacity charge shall be paid upon connection to the City's wastewater works by all commercial and industrial users who contribute wastewater at a peak rate in excess of 10 cubic feet per minute according to the following schedule for each cubic foot per minute or fraction thereof of peak wastewater flow anticipated from the property: Contribution Rate(cubic feet per minute) | Capacity Charge 10 to 15 | $100 per cfm for every cfm over 10 cfm 15 to 30 | $500, plus $50 for each cfm over 15 cfm Over 30 | $1,250, plus $25 for each cfm over 30 cfm B. Upon application for these services, the applicant shall submit an estimated peak wastewater flow, together with the information required in Article V of Part 1 of this chapter, plus any additional information requested by the Director for verification of the estimate. C. If the capacity charge computed above exceeds $500, the first $500 shall be paid with the application and the balance may be paid in the same manner as a betterment assessment. D. At such time as the peak rate of discharge exceeds the amount paid for in the capacity charge, application shall be made for the increased capacity required. Upon approval by the City, an additional capacity charge shall be paid. This new capacity charge shall be calculated in accordance with the above schedule. The amount due shall be equal to the total calculated capacity charge less credit for all previous payments under this section. In the event that the City does not approve the application for additional capacity, the applicant shall, within 60 days, reduce the sixty-day period allowed for reduction of flow that the actual discharge exceeds the approved capacity, shall be considered a separate violation of this Part 2. The discharger shall be subject to fine and penalty in accordance with Section 12(t) of Chapter V of 1972 Revised Ordinances of Springfield. At any time, upon inspection by the City, it is found that the discharge exceeds the approved capacity, he shall be subject to fine in accordance with Section 12(t) of Chapter V of 1972 Revised Ordinances of Springfield for each day that the approved flow is exceeded until a new application is approved. Each day shall be considered a separate offense. E. No reimbursement will be made by the City for reduction of peak rate. F. The capacity charges calculated above shall reimburse the City for capacity provided in the existing wastewater works; however, it will not obligate the City to enlarge the capacity of the existing wastewater works for the benefit of an individual user. Should such enlargements be required, a separate agreement must be entered into with the City. Such agreement must provide for equitable cost recovery by the City. G. The dollar amount of the above capacity charge schedule will be revised annually by the ratio that the Engineering News Record Construction Cost Index for that date bears to 1850, which will become effective on the first Monday in January of each year. H. All commercial and industrial users who are connected to the public sewer on the date that this Part 2 is adopted shall, within 180 days from the date of adoption, make application for capacity on an official form obtained from the Director. Required capacity shall be computed taking fully into account the reduction in peak discharge anticipated by July 1977 through the separation of cooling water and the provision of equalization and surge facilities to minimize peak discharges. Prior to June 30, 1977, the Director will review the application, verify the peak discharge, and establish the capacity charge. The capacity charge for an existing user shall be paid prior to July 1, 1977. In the event that the charge exceeds $500, an initial payment of $500 shall be made prior to July 1, 1977, and the balance shall be paid in accordance with Subsection B of this section. I. Any user who qualifies for delayed payment of the capacity charge under § 300-64 shall forfeit such right if modifications are made (to the wastewater facilities, building, processes, production capability, etc.) which will result in an increase in the peak flow over that discharged during the six-month period prior to the adoption of this Part 2. J. Any user may add wastewater storage facilities which will store all peak discharges for automatic release (controlled by time clock) during times specified by or approved by the Director. If the facilities provided result in a discharge of peak flows during the hours of normal City low flow (1:00 a.m. to 5:00 a.m.) and do not create a peak flow in the public sewers greater than the average daily peak upstream of the user's discharge, then the Director may give an appropriate reduction in the capacity charge.
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.