For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-6 — Report for final plan

Baltimore City Code (current through Ord. 26-129 (July 17, 2026); publication of Oct. 18, 2026) · Baltimore City Code, Article 7, § 22-6

Corpus is an independent public-information project, not the official City of Baltimore website. Stable reference: corpuslaw.us/code/caec1333-b2b7-46ca-b97f-8a985f40206e

§ 22-6. Report for final plan.

The report submitted for final stormwater management plan approval must contain the following, minimum information: (1) a brief narrative description of the project; (2) geotechnical investigations, including soil maps, borings, site specific recommendations, and any additional information necessary to evaluate the final stormwater management design; (3) descriptions of all water courses, impoundments, and wetlands on or adjacent to the site or into which stormwater directly flows; (4) drainage area maps that show pre- development and post-development runoff flow path segmentation and land use; (5) hydrologic computations of the applicable environmental site design and unified sizing criteria, according to the State’s Design Manual, for all points of discharge from the site; (6) hydraulic computations for all environmental site design practices and structural stormwater management measures to be used; (7) structural computations; (8) volume sizing computations, according to the State’s Design Manual, that support the final stormwater management design; and (9) any other information that the Department requires.

(Ord. 10-277; Ord. 02-367.)

Ask a question about Baltimore law

Corpus searches the Baltimore sections it holds and shows the ones that match, with their citations. Free, no sign-in.