For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-84 — Capacity and tracking

Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 25-84

Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/f58e1618-6614-4659-83a8-4a8a5bb82da7

Sec. 25-84. - Capacity and tracking.

(a) Determination of available capacity. The City Engineer will determine the total amounts of water capacity and sewer capacity deemed available for allocation purposes, taking into account the existing (approved or constructed) development projects in the City. (1) Water. The safe yield of all water sources will be considered in determining the total available water supply to satisfy maximum day demand, using a maximum day demand peaking factor of 1.6. (2) Sewer. The treatment capacity of all sewer facilities used by the City will be considered for total sewer treatment capacity for allocation. (b) Annual report. At least once each calendar year, the City Engineer will present to the Mayor and Board of Aldermen a report on the available capacity. Available amounts of capacity, combined with water safe yield or sewer existing use, must not exceed the limits of treatment capacity for water or sewer. (c) Tracking. The City Engineer will track the allocation of water and sewer capacity and will make allocation information available to the public periodically.

(Ord. No. G-12-13, § II, 6-7-12)

Ask a question about Frederick law

Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.