§ 28-39 — Compliance monitoring
Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 28-39
Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/c0fb1275-a5fd-4e02-a392-37c11ee3b712
Sec. 28-39. - Compliance monitoring.
(a) Right of entry: inspection and sampling. The Director shall be permitted to enter and inspect facilities subject to regulation under this article as often as may be necessary to determine compliance with this article. (1) If a discharger has security measures in force which require proper identification and clearance before entry into its premises, the discharger shall make the necessary arrangements to allow access to representatives of the Director. (2) Facility operators shall allow the Director ready access to all parts of the premises for the purposes of inspection, sampling, examination and copying of records that must be kept under the conditions of an NPDES permit to discharge storm water, and the performance of any additional duties as defined by state and federal law. (3) The Director shall have the right to set up on any permitted facility such devices as are necessary in the opinion of the Director to conduct monitoring and/or sampling of the facility's storm water discharge at the discharger's own expense. (4) The Director has the right to require the discharger to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the discharger at its own expense. All devices used to measure storm water flow and quality shall be calibrated to ensure their accuracy. (5) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the operator at the written or oral request of the Director and shall not be replaced. The costs of clearing such access shall be borne by the operator. (6) Unreasonable delays in allowing the Director access to a permitted facility is a violation of a storm water discharge permit and of this article. A person who is the operator of a facility with an NPDES permit to discharge storm water associated with industrial activity commits an offense if the person denies the Director reasonable access to the permitted facility for the purpose of conducting any activity authorized or required by this article.
(Ord. No. G-24-04, § I, 5-2-24)
Ask a question about Frederick law
Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.
