§ 10-15 — Application required
Code of the City of Gaithersburg, Maryland (Codified through Ordinance No. O-08-26, adopted September 8, 2026. (Supp. No. 52)) · Gaithersburg City Code § 10-15
Corpus is an independent public-information project, not the official City of Gaithersburg website. Stable reference: corpuslaw.us/code/283dbfeb-37d7-4d7d-b8f5-68b2c01b28dd
Sec. 10-15. - Application required.
Application for a site development permit shall be made by the owner of the property or the owner's authorized agent (herein referred to as the applicant) prior to the start of any work. The application shall be on a form furnished for that purpose. (a) Application contents. At a minimum, applications shall include: (1) Approved site development plans in accordance with chapter 24 of this Code, which are drawn to scale showing the nature, location, dimensions, and existing and proposed topography of the area in question, and the location of existing and proposed structures, excavation, filling, storage of materials, drainage facilities, and other proposed activities. (2) Elevation of the existing natural ground where buildings or structures are proposed, referenced to the datum on the FIRM. (3) Delineation of flood hazard areas, designated floodway boundaries, flood zones, base flood elevations, and flood protection setbacks. Base flood elevations shall be used to delineate the boundary of flood hazard areas and such delineations shall prevail over the boundary of SFHAs shown on FIRMs. (4) Where floodways are not delineated or base flood elevations are not shown on the FIRMs, the floodplain administrator has the authority to require the applicant to use information provided by the floodplain administrator, information that is available from federal, state, or other sources, or to determine such information using accepted engineering practices or methods approved by the floodplain administrator. [Note: See "Managing Floodplain Development in Approximate Zone A Areas: A Guide for Obtaining and Developing Base (100-Year) Flood Elevations" (FEMA 265).] (5) Determination of the base flood elevations, for development proposals and subdivision proposals, each with at least five (5) lots or at least five (5) acres, whichever is the lesser, in special flood hazard areas where base flood elevations are not shown on the FIRM; if hydrologic and hydraulic engineering analyses are submitted, such analyses shall be performed in accordance with the requirements and specifications of MDE and FEMA. (6) Hydrologic and hydraulic engineering analyses for proposals in special flood hazard areas where FEMA has provided base flood elevations but has not delineated a floodway; such analyses shall demonstrate that the cumulative effect of proposed development, when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood by more than one foot, or a lower increase if required by MDE. (7) For encroachments in floodways, an evaluation of alternatives to such encroachments, including different uses of the site or portion of the site within the floodway, and minimization of such encroachment. (8) If fill is proposed to be placed for a purpose other than to elevate structures, the applicant shall indicate the intended purpose for the fill. (9) For proposed buildings and other structures, as defined in section 10-10, including substantial improvement and repair of substantial damage, repetitive loss structures and placement and replacement of manufactured homes, including substantial improvement and repair of substantial damage: (i) The proposed elevation of the lowest floor, including basement, referenced to the datum on the FIRM and a signed agreement to submit an elevation certificate. (ii) The signed declaration of land restriction (nonconversion agreement) that shall be recorded on the property deed prior to issuance of the certificate of occupancy, if the application includes an enclosure below the lowest floor or a crawl/underfloor space that is more than four (4) feet in height. (iii) A written evaluation of alternative methods considered to elevate structures and manufactured homes, if the location is in nontidal waters of the state and fill is proposed to achieve the elevation required in section 10-34(a) or section 10-35(a). (10) For accessory structures that are three hundred (300) square feet or larger in area (footprint) and that are below the base flood elevation, a variance is required as set forth in article VII. If a variance is granted, a signed declaration of land restriction (nonconversion agreement) shall be recorded on the property deed prior to issuance of the certificate of occupancy. (11) For temporary structures and temporary storage, specification of the duration of the temporary use. (12) For proposed work on existing structures, including buildings, and manufactured homes, and further including any improvement, addition, repairs, alterations, rehabilitation, or reconstruction, sufficient information to determine if the work constitutes substantial improvement or repair of substantial damage, including but not limited to: (i) If the existing building or structure was constructed after December 1, 1982, evidence that the work will not alter any aspect of the building or structure that was required for compliance with the floodplain management requirements in effect at the time the building or structure was permitted. (ii) If the proposed work is a horizontal addition, a description of the addition and whether it will be independently supported or structurally connected to the base building and the nature of all other modifications to the base building, if any. (iii) Documentation of the market value of the building or structure before the improvement or, if the work is repair of damage, before the damage occurred. (iv) Documentation of the actual cash value of all proposed work, including the actual cash value of all work necessary to repair and restore damage to the before-damaged condition, regardless of the amount of work that will be performed. The value of work performed by the owner or volunteers shall be valued at market labor rates; the value of donated or discounted materials shall be valued at market rates. (13) Certifications and/or technical analyses prepared or conducted by a licensed professional engineer or licensed architect, as appropriate, including: (i) The determination of the base flood elevations or hydrologic and hydraulic engineering analyses prepared by a licensed professional engineer that are required by the floodplain administrator or are required by this chapter in: section 10-20 for certain subdivisions and development; section 10-33(a) for development in designated floodways; section 10-33(c) for development in flood hazard areas with base flood elevations but no designated floodways; and section 10-33 for deliberate alteration or relocation of watercourses. (ii) The floodproofing certificate for nonresidential structures that are floodproofed as required in section 10-35(b). (iii) Certification that engineered flood openings are designed to meet the minimum requirements of section 10-34(c)(3) to automatically equalize hydrostatic flood forces. (14) For nonresidential structures that are proposed with floodproofing, an operations and maintenance plan as specified in section 10-35(b)(3). (15) Correspondence from MDE showing compliance with section 10-14(b). (16) Such other material and information as may be requested by the floodplain administrator and necessary to determine conformance with this chapter. (b) New technical data. (1) The applicant may seek a letter of map change by submitting new technical data to FEMA, such as base maps, topography, and engineering analyses to support revision of floodplain and floodway boundaries and/or base flood elevations. Such submissions shall be prepared in a format acceptable to FEMA and any fees shall be the sole responsibility of the applicant. A copy of the submittal shall be attached to the application for a permit. (2) If the applicant submits new technical data to support any change in floodplain and designated floodway boundaries and/or base flood elevations but has not sought a letter of map change from FEMA, the applicant shall submit such data to FEMA as soon as practicable, but not later than six (6) months after the date such information becomes available. Such submissions shall be prepared in a format acceptable to FEMA and any fees shall be the sole responsibility of the applicant.
(Ord. No. O-10-15, 10-19-15; Ord. No. O-6-24, 11-4-24)
Ask a question about Gaithersburg law
Corpus searches the Gaithersburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.
