Sec. 22-5. - Utility lines.
(a) General. (1) Except as provided in section 22-4 or subsection (a)(2) below, this section applies to a proposed land-disturbing activity requiring a sediment control permit for the construction, reconstruction or replacement of public utility lines (except water and sewer lines) within a public right-of-way, public utility easement or a public utility right-of-way owned by the utility. (2) This section does not apply if a public utility easement will be located on the property of a development subject to article II of this chapter. Satisfaction of the regulatory requirements of that article applicable to activities on the easement is the responsibility of the owner of the property. (b) Calculation rules; single lot exemption. (1) To determine the applicability of this chapter under section 22-3(b) to proposed activities within a public right-of-way or public utility easement, the calculation of land area must be based on the limits of disturbance as shown on the sediment control permit. (2) A public right-of-way, public utility easement, or privately owned utility right-of-way is considered to be a single lot for purposes of an exemption under section 22-4(a) if the proposed activity and any future stages of the work on the utility line will not result in the cumulative cutting, clearing or grading of more twenty thousand (20,000) square feet of forest or the cutting, clearing or grading of any trees or forest that are subject to a previously approved forest conservation or tree save plan. A declaration of intent is not required under section 22-4(a)(4); however, any subsequent stages of the work must be identified at the time of the initial sediment control permit application. (3) If the single lot exemption is not applicable, afforestation or reforestation requirements must be calculated using the net tract area applicable to the entire proposed utility line without regard to project segments subject to a specific sediment control permit. The property boundaries of the privately owned utility right-of-way, public utility easement or public right-of-way (to the extent of the utility work) must be used in calculating the area of the tract. The net tract area should reflect any reduction in land area that will continue to be used for agricultural activities.
(Ord. No. O-07-26, 6-1-26)
Ask a question about Gaithersburg law
Corpus searches the Gaithersburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.