§ 10-26 — General
City Code of the City of Rockville, Maryland (Codified through Ordinance No. 1-26, adopted January 12, 2026. (Supp. No. 17, Update 1)) · Rockville City Code § 10-26
Corpus is an independent public-information project, not the official City of Rockville website. Stable reference: corpuslaw.us/code/2f69416e-ea03-4ba1-9ba8-1f7a459d89e3
Sec. 10-26. - General.
(a) As of the effective date of the ordinance from which this chapter derives, it shall be unlawful for any person or applicant to begin any development or construction which is wholly within, partially within, or in contact with any special flood hazard area established in section 10-6, until a floodplain variance and floodplain permit are obtained from the City, in accordance with this chapter. (b) The following types of development are exempted from requiring a floodplain variance and only require a floodplain permit: (1) Public utility transmission, distribution, or collection pipes, lines and facilities; (2) Public facilities owned or operated by the City, provided that they are located and constructed to minimize flood damage; (3) Minor landscaping installation and maintenance; (4) Split-rail fences or other fences deemed by the City to not be obstructive to the passage of floodwaters; (5) Play or seating equipment that is not a structure; and (6) Patios, decks, paths and paving less than one thousand (1,000) square feet that do not raise the surrounding grade by more than one (1) foot. (7) Recreational vehicles that are fully licensed and ready for highway use or are on a site for less than one hundred eighty (180) consecutive days. (c) A floodplain variance grants the City's permission for development to occur within the special flood hazard area, including repairs, improvements or additions to an existing building, and regardless of whether the existing building pre-dates the City's entry into the National Flood Insurance Program or the effective date of this chapter. A floodplain permit, which governs technical design and construction details, must also be obtained either concurrently or subsequent to the floodplain variance and prior to start of any development or construction. (d) A floodplain variance must be approved prior to the issuance of City construction permits, including erosion and sediment control permit, stormwater management permit, building permit, or other City permit related to the proposed development. It may be approved at any stage of the subdivision or site plan approval process, if such approval is required. (e) A floodplain variance shall be approved only if it is determined to not be contrary to the public interest and where, owing to special conditions of the lot or parcel, a literal enforcement of the provisions of this chapter would result in an unnecessary hardship. (f) The Floodplain Administrator shall have the power to consider and authorize or deny floodplain variances from the strict application of the requirements of this chapter, particularly of the prohibition in section 10-56 against new structures or other development within the special flood hazard area. Upon consideration of the purposes of this chapter, the individual circumstances, and the considerations and limitations of this section, the Floodplain Administrator may attach such conditions to floodplain variances as it deems necessary to further the purposes of this chapter. (g) No floodplain variance shall be granted for an accessory structure that exceeds six hundred (600) square feet in total floor area. (h) The Floodplain Administrator shall notify, in writing, that the floodplain variance is to the floodplain management requirements of this chapter only, and that the cost of federal flood insurance will be commensurate with the increased risk, with rates up to twenty-five dollars ($25.00) per one hundred dollars ($100.00) of insurance coverage, to any applicant to whom a floodplain variance is granted to construct or substantially improve a building or structure with its lowest floor below the elevation required by this chapter. (i) A record of all floodplain variance actions, including justification for issuance, shall be maintained pursuant to subsection 10-17(10) of this chapter. (j) Failure of the department to observe or recognize hazardous conditions or failure to deny the floodplain variance and subsequent floodplain permit will not relieve the permittee from the responsibility for the hazardous conditions or damages resulting therefrom and will not result in the City or its officers or agents being responsible for the damages resulting therefrom. (k) A floodplain variance approval will remain valid for two (2) years or for the term of any related City site plan approval for the same development proposal, whichever is longer. However, a floodplain variance may be revoked or modified by the Floodplain Administrator at any time if there has been an amendment or revision to the basis for establishing special flood hazard areas and base flood elevations set forth in section 10-6, or there has been a change in the development proposal.
(Ord. No. 1-17, § 1, 1-9-17)
Ask a question about Rockville law
Corpus searches the Rockville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
