§ 10-36 — Floodplain permits required and expiration
City Code of the City of Rockville, Maryland (Codified through Ordinance No. 1-26, adopted January 12, 2026. (Supp. No. 17, Update 1)) · Rockville City Code § 10-36
Corpus is an independent public-information project, not the official City of Rockville website. Stable reference: corpuslaw.us/code/51c94d5a-7cd3-4082-961d-48894c6eb432
Sec. 10-36. - Floodplain permits required and expiration.
A floodplain permit from the City, in conjunction with a floodplain variance, is required for development or construction within the special flood hazard area. (1) It shall be unlawful for any person to begin any development or construction which is wholly within, partially within, or in contact with any special flood hazard area established in section 10-6, including but not limited to: filling; grading; construction of new structures; the substantial improvement of buildings or structures, including repair of substantial damage; placement or replacement of manufactured structures, including substantial improvement or repair of substantial damage of manufactured structures; erecting or installing a temporary structure, or alteration of a watercourse, until a floodplain variance and floodplain permit are obtained from the City, in accordance with this chapter. However, types of development listed in subsection 10-26(b) require only a floodplain permit and do not require a floodplain variance. No floodplain variance or floodplain permit shall be issued until the requirements of this chapter have been met. (2) In addition to the floodplain permit required in subsection (1), applicants for permits in nontidal waters of the State are advised to contact MDE. Unless waived by MDE, pursuant to Code of Maryland Regulations 26.17.04, Construction on Nontidal Waters and Floodplains, MDE regulates the "100-year frequency floodplain of free-flowing waters," also referred to as nontidal waters of the State. To determine the 100-year frequency floodplain, hydrologic calculations are based on the ultimate development of the watershed, assuming current zoning at the time of the study. The resulting flood hazard areas delineated using the results of such calculations may be different than the special flood hazard areas established in section 10-6 of this chapter. A floodplain permit from the City is still required in addition to any State requirements. (3) A floodplain permit is valid provided the actual start of work is within one hundred eighty (180) days of permit issuance. Requests for extensions shall be submitted in writing and justifiable cause demonstrated. The Floodplain Administrator may grant, in writing, one or more extensions of time, for additional periods not exceeding ninety (90) days each and provided there has been no amendment or revision to the basis for establishing special flood hazard areas and base flood elevations set forth in section 10-6. (4) The burden is on the applicant to show that the proposed development is not in the special flood hazard area in order to proceed without obtaining a floodplain variance and floodplain permit.
(Ord. No. 1-17, § 1, 1-9-17)
Ask a question about Rockville law
Corpus searches the Rockville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
