§ 10.5-22 — Tree replacement, reforestation and afforestation
City Code of the City of Rockville, Maryland (Codified through Ordinance No. 1-26, adopted January 12, 2026. (Supp. No. 17, Update 1)) · Rockville City Code § 10.5-22
Corpus is an independent public-information project, not the official City of Rockville website. Stable reference: corpuslaw.us/code/44ee0250-097d-47df-bca5-4d4eb8fcef16
Sec. 10.5-22. - Tree replacement, reforestation and afforestation.
(a) Tree replacement and reforestation. After all efforts to maximize forest and tree preservation onsite, as required in section 10.5-21, have been exhausted, the FCP shall provide for tree replacement, afforestation, and reforestation onsite as follows: (1) Tree replacement. Individual significant trees removed, whether within the forest or outside the forest, shall be replaced at the following rates with similar species. In the event that adequate space does not exist for similar species, smaller species may be utilized, subject to the Forestry Official's approval. Size of Significant Tree Removed (inches) | Minimum 2½-Inch Caliper Tree Replacement (number of trees) 6—18 DBH | 1 19—24 DBH | 2 25—29 DBH | 3 30 and greater DBH | 6 (2) Reforestation. For all existing forest cover measured to the nearest 100 square feet cleared on the tract area: a. Forest cover outside of priority retention areas shall be reforested at a ratio of 50 square feet planted for every 100 square feet removed above the forest conservation threshold established in subsection (c) of this section for the zone in which the tract is located; b. Forest cover within or containing priority retention areas shall be reforested at a ratio of 100 square feet planted for every 100 square feet removed above the forest conservation threshold established in subsection (c) of this section for the zone in which the tract is located; and c. All forest cover removed below the forest conservation threshold established in subsection (c) of this section for the zone in which the tract is located shall be reforested at a ratio of 300 square feet planted for every 100 square feet removed. (3) Reforestation Credit. The Forest Conservation Manual may provide for a credit against the area required to be reforested for: a. Forested areas retained above the forest conservation threshold; b. Individual significant trees retained outside of the forest retention areas, where 75 percent of the critical root zone is preserved; and c. Street trees planted, not to exceed 25 percent of the total reforestation requirement. (b) Afforestation. (1) Afforestation is not required for a solar photovoltaic facility or activities conducted on a tract with an area of less than 40,000 square feet. (2) Where forest cover on a tract prior to development activity is less than the percentage of coverage established in subsection (c) of this section as the afforestation level for the zone in which the tract is located, the FCP shall provide for the afforestation of the tract to the applicable afforestation level. (3) Forest cut or cleared below the required afforestation level, in accordance with section 10.5-21, shall be replaced at a rate of three (3) times the area removed and added to the amount of afforestation necessary to reach the minimum required afforestation level, as determined by the amount of forest existing before cutting or clearing began. (4) The Forest Conservation Manual may provide for: a. A credit against the area required to be afforested for: (i) Individual significant trees retained outside of the forest retention areas, where 75 percent of the critical root zone is preserved; and (ii) Street trees planted, not to exceed 25 percent of the total afforestation requirement. b. Calculation of afforestation requirements based on less than the tract area where 75 percent of a tract area has previously been developed and no more than 25 percent of the tract area will be disturbed. c. Calculation of afforestation requirements based on less than the tract area: (i) Where 75 percent of a tract area has been previously developed; and (ii) The tract consists of one or more lots or parcels of land under common ownership aggregating at least 80 acres in size; and (iii) No more than 50 percent of the tract area will be disturbed. (c) Forest conservation thresholds and afforestation levels. Applicable Zones | Forest Conservation Threshold (percent) | Afforestation Level (percent) R-400, R-200 | 30 | 20 R-90, R-75, R-60, R-150 | 25 | 15 R-40, RMD-INFILL, RMD-10, RMD-15, RMD-25 | 15 | 15 I-L, I-H, MXT, MXC, MXCT, MXNC, MXB, MXE, MXCD, MXTD | 15 | 15 For planned developments the thresholds and levels are those applicable to the designated equivalent zone, as set forth in Chapter 25. (d) Minimum tree cover. (1) Except as otherwise provided in this section, the minimum tree cover to be provided onsite is the same percentage of the tract area as the afforestation level. (2) In the MXCD, MXTD and MXNC zones, the minimum tree cover to be provided onsite is 10 percent of the tract area. (3) In the MXE zone, if at least five percent of the tract area is dedicated in fee simple to the City as useable public parkland, the minimum tree cover to be provided onsite is 10 percent of the tract area. Any parcel of land dedicated to the City pursuant to this subsection must be a minimum of 20,000 square feet. It is the Director of Recreation and Park's sole discretion to determine whether to accept the dedication of land and whether land is usable public parkland. Trees planted on the land to be dedicated to the City may count towards the minimum tree cover requirement, but the Forestry Official must approve any such planting. (4) For a champion project, as defined in Chapter 25, the Mayor and Council, at the time a project plan resolution is approved, may establish the minimum tree cover to be provided onsite. The minimum tree cover for a champion project can be established at no less than five percent of the tract area. (5) Replacement trees, reforestation, afforestation and existing trees can be used to satisfy tree cover requirements. Tree cover requirements shall be calculated and shown on the FCP. (e) The Forest Conservation Manual may provide for implementation of tree replacement, reforestation, and afforestation requirements in stages tied to phased development activity. Tree replacement, reforestation, and afforestation shall be accomplished within one (1) year or two (2) growing seasons after completion of the development project, as specified on the approved FCP. (f) Upon meeting the reforestation and afforestation requirements in this section, all unforested riparian buffers onsite must be afforested and reforested, unless the Forestry Official finds, based on information provided by the applicant, that afforestation or reforestation in the riparian buffer: (1) Would be in conflict with allowable uses as established for the riparian buffer; (2) Is located on City park property and conflicts with the mission and established stewardship practices of the Department of Recreation and Parks; or (3) Is not suitable for the establishment and retention of the required planting materials, in which case the applicant must implement substitute environmental protection measures approved by the Forestry Official. (g) A minimum of 80 percent of all trees planted by or on behalf of an applicant to satisfy the requirements of this section must be native trees. To the extent possible, forest conservation requirements should be met using a diversity of tree species.
(Ord. No. 12-07, 7-16-07; Ord. No. 10-09, § 3, 3-23-09; Ord. No. 21-09, 10-12-09; Ord. No. 23-15, 8-3-15; Ord. No. 18-18, 10-15-18; Ord. No. 1-26, 1-12-26)
Ask a question about Rockville law
Corpus searches the Rockville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
